Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Probe � � nor <br /> Ct ' :'Aet10 <br /> CQnS15 Condittons o <br /> � �� � Approval <br /> Section tenc <br /> �y N u,and:Ev, rx .k' <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis idence of Coti%pliance �(COA) <br /> Water service to lands outside Neighborhood F will <br /> BBID Service to continue as detailed in the project description. Water <br /> Interim To maintain water service to lands outside of the service will also be provided to areas within <br /> Agricultural Mountain House project area which are within the Neighborhood F which will continue to be farmed as <br /> 1219 12.3.4.0.a Operations BBID service area. Y the Neighborhood builds out. None. <br /> BBID Service to <br /> Interim <br /> Agricultural To maintain a supply of irrigation water to lands under <br /> 1220 12.3.4.0.b Operations agricultural use. Y See# 1219 None. <br /> BBID Service to Continued irrigation water and drainage service shall <br /> Interim be provided to the land within the BBID service area <br /> Agricultural located east of the project site and Patterson Pass Road <br /> 1221 12.3.4.P.a Operations throughout project buildout. Y See# 1219 None. <br /> Irrigation water service and drainage shall be <br /> BBID Service to maintained so long as required by farming practices. <br /> Interim In order to assure continued service to remaining <br /> Agricultural customers, BBID's ability to provide service shall not <br /> 1222 12.3.4.P.b Operations be impaired. Y See# 1219 None. <br /> BBID Service to <br /> Interim The project shall provide permanent or interim <br /> Agricultural facilities as needed,as each phase develops,that will <br /> 1223 12.3.4.P.c Operations assure continued service to BBID customers. Y See# 1219 None. <br /> Continuation of Agricultural Water Service. The <br /> appropriate Specific Plans shall identify how water and <br /> drainage services to the land east of the project and <br /> Patterson Pass Road within the BBID service area <br /> would be affected. They shall identify the <br /> BBID Service to infrastructure needed to maintain these services and <br /> Interim when construction of these facilities would need to be <br /> Agricultural completed(schedule may be expressed in terms of <br /> 1224 12.3.4.I.a 10perations when certain parcels are developed). N/A Not applicable at Tentative Map stage. None. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page262 <br />