Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project. aCt10n or:: <br /> " Consts Conditions o <br /> Section tency f ,� Approvals. <br /> I Heading# Title Text YM/NA` Finding of FactVAnalysis and Evidence of Compliance ''`(COA) <br /> Requirements for Agricultural Irrigation. To ensure an <br /> uninterrupted source of irrigation water to <br /> undeveloped land, Development Permits,as <br /> applicable,shall include a detailed assessment of how <br /> irrigation water and drainage services to land within <br /> the project site that has not been or is not immediately <br /> planned for development would be affected. The <br /> assessment shall include consideration of interruption <br /> of irrigation patterns,temporary interruptions in <br /> service due to installation of underground utilities,and <br /> access to farm fields by workers,equipment and <br /> BBID Service to trucks. A plan for constructing/modifying facilities to <br /> Interim maintain irrigation water and drainage services and a <br /> Agricultural schedule for constructing these facilities shall be Please see the Farm Irrigation Drainage Report <br /> 1225 12.3.4.1.b Operations included. Y submitted with the application. COA-10, 11 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page263 <br />