My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> JedAction or. <br /> Consis Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Pump Station and Pipeline, The Use Permit for the <br /> initial phase of the water treatment plant shall include <br /> provisions for a new or expanded pump station and <br /> conveyance pipeline(s) from the water source to the <br /> treatment plant. The size, number,and location of the <br /> Raw Water pipeline(s)shall be finalized prior to the County's <br /> 1231 12.3.5.1.a Conveyance approval of the use permit. N/A See line 1230 None. <br /> Capacities. Both the new pump station(or additional <br /> pumps)and the pipeline(s)shall be designed to convey <br /> the flow required to serve maximum day demands at <br /> Mountain House during the various phases of <br /> development. Ultimately,the capacity of the pump <br /> Raw Water station and conveyance system will need to be <br /> 1232 12.3.5.I.b Conveyance approximately 20 mgd(31 cfs or 13,900 gpm). N/A See line 1230 None. <br /> Pumn Station Requirements. The new pump station <br /> shall provide backup diesel power as necessary to <br /> insure reliability. The entire pump station building and <br /> the pumps needed to serve the initial phases of <br /> development shall be constructed initially. Additional <br /> pumps shall be added to the pump station as <br /> development occurs and the demand for water <br /> Raw Water increases. One standby pump shall be provided at all <br /> 1233 12.3.5.1.c Conveyance phases of the pump station phasing. N/A See line 1230 None. <br /> The Mitigated Negative Declaration prepared for the <br /> subdivision indicates that the project will have a less <br /> than significant impact on biological resources. The <br /> Impact on Habitat. Construction of the BBID raw initial study indicated that construction of <br /> water conveyance pipelines from the intake off-site to Y,as infrastructure to support the Neighborhood may have <br /> Raw Water the on-site water treatment plant shall not impact any condition an impact on area wetlands and recommended a COA-31,32, <br /> 1234 12.3.5.1.d Conveyance special-status animal or plant species. ed condition of approval to mitigate this potential impact. 33,34 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page265 <br />
The URL can be used to link to this page
Your browser does not support the video tag.