Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions of <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Water system operations and facility maintenance will <br /> be the responsibility of the CSD. Facilities will be <br /> maintained on an ongoing basis,with maintenance <br /> activities funded from user charges on the monthly <br /> water bills paid by community residents and <br /> businesses. Maintenance personnel will be cross- <br /> trained to handle the maintenance of all water and <br /> wastewater equipment which will minimize <br /> duplication of effort and maximize cost savings. <br /> Operations and These service costs and the corresponding revenues are The CSD is responsible for implementation of these <br /> 1278 12.5.2.a Maintenance included in the fiscal analysis in the PFP. N/A provisions of the Master Plan. None. <br /> CHAPTER <br /> THIRTEEN: <br /> WASTEWATE <br /> R <br /> TREATMENT <br /> AND <br /> COLLECTION <br /> 1279 13 SYSTEM <br /> The area to be served by the wastewater trunk <br /> WASTEWATE collection system is limited to the proposed Mountain <br /> R TRUNK House community. Figure 13.1: Wastewater <br /> COLLECTION Collection and Treatment Facilities shows the <br /> 1280 13.4 SYSTEM wastewater trunk collection system for the community. <br /> As stated in the project description,the developer will <br /> WASTEWATE construct water, sewer,and storm drain facilities to the <br /> R TRUNK To transport wastewater from all areas within the Neighborhood prior to any development. These <br /> COLLECTION community to the treatment plant and avoid any facilities are to be constructed to CSD standards and in COA-4, 5, <br /> 1281 13.3.0.a SYSTEM adverse impacts on public health and safety. Y compliance with the requirements of the Master Plan. 37, 86 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page278 <br />