My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> ' ., ,4• y '. .: <br /> Project Action or, <br /> Consis=. Condtttons`o <br /> Section - tency; Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence Vof Compliance (C A) <br /> Design of Storm Facilities. Detailed studies for each <br /> watershed area shall be prepared and utilized in the <br /> design of each segment of storm facilities required for <br /> each Specific Plan,and shall be completed and <br /> approved prior to the approval of Specific Plans. For <br /> OFF-SITE Specific Plan I,these studies shall be approved prior to COA-4,37, <br /> 1350 15.3.I.b WATERSHEDS approval of the first Final Map. Y See line 1343 96 <br /> Phasing of Improvements, Each segment of the storm <br /> OFF-SITE drainage system shall be designed as needed to provide COA-4,37, <br /> 1351 15.3.I.c WATERSHEDS protection for each phase of development. Y See line 1343 96 <br /> PRIMARY <br /> STORM <br /> DRAIN <br /> COLLECTION <br /> 1352 15.4 SYSTEM <br /> As stated in the project description,the CSD will <br /> construcfthe necessary storm drain facilities to serve <br /> Neighborhood F in accordance with the Master Storm <br /> Water Plan. The facilities will include: a perimeter <br /> ditch around the south and west side of the <br /> Neighborhood,a series of minor grading excavations <br /> as well as perimeter berms adjacent to the Mountain <br /> House Creek corridor to keep creek storm flows within <br /> the existing flood basin,construction of storm water <br /> conveyance pipes within the De Anza and Mountain <br /> House Parkway roadway corridors,construction of <br /> PRIMARY temporary berms north of Byron Road to protect non- <br /> STORM To insure that on-site and off-site drainage generated Trimark owned lands and to focus flows toward <br /> DRAIN by precipitation and urban run-off are jointly existing discharge locations into Old River,and a COA-37,39, <br /> COLLECTION considered and are conveyed safely through the interim storm water retention basin north of Byron 80,94,95, <br /> 1353 15.4..O.a ISYSTEM Icommunity. I Y 1 Road.. 196,97,98 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page293 <br />
The URL can be used to link to this page
Your browser does not support the video tag.