Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> ' ., ,4• y '. .: <br /> Project Action or, <br /> Consis=. Condtttons`o <br /> Section - tency; Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence Vof Compliance (C A) <br /> Design of Storm Facilities. Detailed studies for each <br /> watershed area shall be prepared and utilized in the <br /> design of each segment of storm facilities required for <br /> each Specific Plan,and shall be completed and <br /> approved prior to the approval of Specific Plans. For <br /> OFF-SITE Specific Plan I,these studies shall be approved prior to COA-4,37, <br /> 1350 15.3.I.b WATERSHEDS approval of the first Final Map. Y See line 1343 96 <br /> Phasing of Improvements, Each segment of the storm <br /> OFF-SITE drainage system shall be designed as needed to provide COA-4,37, <br /> 1351 15.3.I.c WATERSHEDS protection for each phase of development. Y See line 1343 96 <br /> PRIMARY <br /> STORM <br /> DRAIN <br /> COLLECTION <br /> 1352 15.4 SYSTEM <br /> As stated in the project description,the CSD will <br /> construcfthe necessary storm drain facilities to serve <br /> Neighborhood F in accordance with the Master Storm <br /> Water Plan. The facilities will include: a perimeter <br /> ditch around the south and west side of the <br /> Neighborhood,a series of minor grading excavations <br /> as well as perimeter berms adjacent to the Mountain <br /> House Creek corridor to keep creek storm flows within <br /> the existing flood basin,construction of storm water <br /> conveyance pipes within the De Anza and Mountain <br /> House Parkway roadway corridors,construction of <br /> PRIMARY temporary berms north of Byron Road to protect non- <br /> STORM To insure that on-site and off-site drainage generated Trimark owned lands and to focus flows toward <br /> DRAIN by precipitation and urban run-off are jointly existing discharge locations into Old River,and a COA-37,39, <br /> COLLECTION considered and are conveyed safely through the interim storm water retention basin north of Byron 80,94,95, <br /> 1353 15.4..O.a ISYSTEM Icommunity. I Y 1 Road.. 196,97,98 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page293 <br />