Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project 'Action or'` <br /> Consis- �� Conditions of <br /> Section tency Approval <br /> I Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> PRIMARY <br /> STORM <br /> DRAIN To insure that on-site drainage will not impact COA-37,39, <br /> COLLECTION property owners adjacent or within the community,or 80,94,95, <br /> 1354 15.4.0.b SYSTEM downstream property owners. Y See# 1353 96,97,98 <br /> PRIMARY <br /> STORM <br /> DRAIN COA-37,39, <br /> COLLECTION To minimize the discharge of sediment to creeks, 80,94,95, <br /> 1355 15.4.0.c SYSTEM ditches and Old River. Y See# 1353 96,97,98 <br /> PRIMARY The CSD adopted Neighborhood F Storm water Report <br /> STORM presents calculations of 100-year storm impacts and <br /> DRAIN Y,as proposes specific improvements necessary to <br /> COLLECTION Pipes and/or open-channels shall be designed with 100 condition adequately convey the flow pursuant to Master Plan COA-4,37, <br /> 1356 15.4.P.a SYSTEM year flood capacity to a point of terminal discharge. ed requirements. 96 <br /> PRIMARY <br /> STORM All storm water facilities shall be designed in <br /> DRAIN Y,as compliance with the Master Plan,Neighborhood F <br /> COLLECTION condition Storm Water Report and CSD Master Storm Water COA-4,37, <br /> 1357 15.4.P.b SYSTEM Open-channels shall be designed to minimize erosion. ed Plan. 96 <br /> The CSD adopted Neighborhood F Storm water Report <br /> presents recommendations for the construction of an <br /> PRIMARY interim water quality basin. In addition,the Mitigated <br /> STORM Negative Declaration adopted for the subdivision <br /> DRAIN Sediment generated by grading or construction Y,as includes requirements for the obtaining of CVRWQCB <br /> COLLECTION activities shall be subject to BMP's prior to discharge condition construction permits to control erosion from COA-4,37, <br /> 1358 15.4.P.c SYSTEM to creeks,ditches and Old River. ed construction sites. 96 <br /> PRIMARY <br /> STORM Trunk line pipes(72 inch and larger),detention basins, <br /> DRAIN and major open-channels shall be designed and Y,as <br /> COLLECTION constructed to transport the 100-year volumetric flow condition COA-4,37, <br /> 1359 15.4.P.d ISYSTEM irate. ed See# 1357 96 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page294 <br />