Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> I # Title Text Y/NMA Compliance (COA) <br /> Specific Plan I will include restoration of a primary portion of the <br /> Mountain House Creek corridor. The Specific Plan I portion of the <br /> Mountain House Creek Linear Park will provide a continuous trail <br /> along the creek and allow for extensions to community and regional <br /> parks and other facilities developed as part of future Specific Plans. <br /> The plan for creek habitat restoration is contained in Appendix SP-7_- <br /> A_Mountain House Creek Phase One Habitat Restoration Plan <br /> 143 7.1.3(2) Community Parks ("Restoration Plan"). N/A Not applicable to Neighborhood F. None. <br /> In addition to community park areas along Mountain House Creek, <br /> an I I-acre community park is located within the Specific Plan Area <br /> on the east side of Central Parkway,on the north edge of the future <br /> Town Center(see Figures 7.3: First Phase Community Park <br /> Concept and L-4_Permanent Community Park Concept). Initial, <br /> interim improvements to this park may include ballfields(if there <br /> are no other community-wide ballfields available in the community <br /> by the time the 800th building permit has been issued), although <br /> long tern plans call for multi-purpose open areas and facilities <br /> including an open amphitheater,that will reinforce the Town The project proposes an interim <br /> Center's function as a central community gathering area. Ultimate community park sports field north of the <br /> development of the park shall be more urban in nature,compatible high density residential area adjoining <br /> 144 7.1.3(3) Community Parks with the intensive development of the future Town Center. Y De Anza Blvd. COA-19 <br /> 145 <br /> Community Park Plans. Conceptual site plans for the Mountain <br /> House Creek Linear Park and the I I-acre community park located at <br /> Central Parkway and Main Street,adjacent to the future Town <br /> Center,are shown on Figures 7.2. 7.3. and 7.4. Final and <br /> Construction Plans for either the 11 acre community park or the south <br /> high school site,shall be prepared by the CSD prior to issuance of <br /> the 500th dwelling unit permit, for the construction of interim sports <br /> fields. If sports fields are located at the high school site, Final and <br /> Construction Plans for this park will be submitted with issuance of <br /> 146 7.1.3(4)a Community Parks the 1,500th dwelling permit. Y See#144 COA-19 <br /> 09/29/2000 SP-924(finaIFINDINGS) Page35 <br />