Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> 1 # Title Text Y!N/NA Com Dance (COA). <br /> WATER Because the first years of the Specific Plan use little water and the <br /> TREATMENT sludge drying beds are sized for the full 25%of community <br /> PLANT SLUDGE buildout,sludge disposal will not be required through the buildout o <br /> 231 12.6(1) DISPOSAL Specific Plan I. N/A Not applicable. None. <br /> CHAPTER <br /> THIRTEEN: <br /> WASTEWATER <br /> COLLECTION <br /> AND <br /> 232 13 TREATMENT N/A None. <br /> The wastewater collection system for <br /> BACKBONE figure 13.1: Wastewater Backbone Collection System shows the Neighborhood"F" is consistent with the <br /> WASTEWATER proposed trunk pipeline collection system that will serve the Specific collection system concepts in the <br /> COLLECTION Plan Area. This proposed design is in conformance with the Specific Plan. See infrasructure map in <br /> 236 13.3(1) SYSTEM requirements of the Master Plan and County standards. Y project application. None. <br /> The subdivision application describes <br /> back-bone facilities that will be required <br /> to serve the subdivision area. these <br /> facilities have ben determined to be <br /> Some trunk facilities will be required to be installed outside the consistent with adopted CSD Master <br /> BACKBONE boundary of the Specific Plan. These facilities will be those needed Plans. Subsequent improvement plans <br /> WASTEWATER to adequately convey wastewater to the wastewater treatment plant must be prepared consistent with these <br /> COLLECTION located within the Old River Industrial Park through connecting plans and will be reviewed prior to Final <br /> 237 13.3(2) SYSTEM areas not within the Specific Plan Area. Y 1 Maps. COA-72,85 <br /> Facilities installed to serve <br /> Neighborhood F,consistent with CSD <br /> BACKBONE In addition,as each neighborhood,commercial or industrial area of Standards,will be sized to accommodate <br /> WASTEWATER the Specific Plan develops,sufficient trunk facilities will be installed future phases. Sizes for facilities <br /> COLLECTION through the phase under development to adequately serve future proposed by the applicant conform to the COA- <br /> 238 13.3(3) SYSTEM upstream phases of the project. Y Master Plans adopted by the CSD. 72+G250 <br /> 09/29/2000 SP-924(finaIFINDINGS) Page52 <br />