Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> I # Title Text Y/N/NA Compliance (COA <br /> The wastewater treatment facilities will be located adjacent to the <br /> West Side Irrigation District Intake Channel, north of Bethany Road, <br /> along the cast side of the project. Secondary treatment of The wastewater treatment plant is sited <br /> WASTEWATER wastewater will be provided in two phases of different methods consistent with this requirement. Please <br /> 239 13.4(1) TREATMENT during Specific Plan buildout. Y see Use Permit 98-16. None. <br /> Wastewater from the early phases of the community's development <br /> will be treated in aerated lagoons with additional treatment <br /> (including disinfection)depending on how the treated wastewater is <br /> disposed of,or used. It is anticipated that the aerated lagoons would <br /> not be used for treatment longer than at 10%buildout of the <br /> community. Later phases of development will utilize process such Improvement Plans for the first phases o <br /> as activated sludge which are more suitable for larger volumes of the Wastewater Treatment Plant <br /> wastewater. The level of treatment may vary over the buildout of necessary to serve the subdivision,have <br /> the community depending on the changes in community needs, already been reviewed for consistency <br /> regulations and advances in treatment technology. It is presently with the Specific Plan, Master Plan,the <br /> contemplated that tertiary treatment may be used at the outset. The prior approved County Use Permit 98- <br /> WASTEWATER planned treatment level at buildout shall be tertiary,suitable for 16,and State Agencies,and the plans <br /> 240 13.4(2) TREATMENT regulatory approved reuse and river discharge. Y have been approved by the CSD. None. <br /> Possible wastewater treatment plant site layouts for the initial <br /> facultative lagoon system and for the Master Plan system are shown <br /> in Figures 13.2 and 13.3,respectively. Figure 13.3 shows all <br /> WASTEWATER anticipated Master Plan facilities, including features for tertiary <br /> 241 13.4(3) TREATMENT treatment, if required. Y See#234. None. <br /> All wastewater treatment facilities will be designed in accordance <br /> WASTEWATER with State requirements for wastewater reclamation plants, including <br /> 242 13.4(4) TREATMENT various reliability and alarm features. Y See#234 None. <br /> Initial Treatment Capacity. The treatment facilities shall have the capacity to handle <br /> 243 1 13.4.1(a) Plant peak flows. Y See#234 None. <br /> 09/29/2000 SP-924(finalFINDINGS) Page53 <br />