Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> 1 # Title Text Y/N/NA Compliance (COA) <br /> Terminal Drainaee. Downstream of the last improved section of <br /> Mountain House Creek, the existing culverts,channel and farm <br /> pump station(s)may be used to provide terminal drainage to Old <br /> River in their existing conditions. Actual size, locations and <br /> 15.1.4(6) Primary Storm configuration of improvements shall be determined during the COA-94,96, <br /> 286 c Drain Collection design of the facilities prior to the approval of the first final map. Y See#282 97 <br /> Existing Pump Stations. The existing farm pump station(s)shall be See#282. In addition,the CSD has <br /> used for terminal drainage to Old River. If used, these pumps shall required the applicant to prepare a <br /> be maintained,as required, to match the capacity of the three emergency storm water pumping plan, <br /> existing 36-inch culverts under Byron Road. Actual locations and for CSD review and approval which <br /> 15.1.4(6) Primary Storm configuration of pump stations shall be determined during the design further addresses the needs of storm <br /> 287 d Drain Collection of the facilities prior to the approval of the first Final Map. Y water discharge. COA-95 <br /> Ditches. New farm ditches located along the west boundary of the <br /> Specific Plan Area shall intercept off-site sheet flow adjacent to the <br /> 15.1.4(6) Primary Storm Specific Plan Area. The terminal drain for these ditches shall <br /> 288 a Drain Collection continue to be the local farm drain system. N/A Not required for Neighborhood F None. <br /> As required <br /> by Master <br /> Plan <br /> Secondary Storm See the Master Plan for a plan of the secondary storm drain Please see Master Plan Consistency Consistency <br /> 289 15.1.5(1) Drain Collection collection system. y Findings. Findings. <br /> A preliminary design of Mountain House Creek Flood Plain is <br /> described in the Master Plan document and its technical appendices. <br /> As indicated in Figure 15.1, a length of Mountain House Creek will <br /> be improved with an overflow flood plain beginning approximately <br /> 1,000 feet downstream of the Alameda/San Joaquin County Line <br /> and ending approximately 800 feet upstream of Byron Road. <br /> Mountain House Downstream of this point the existing facilities(culverts,channel Not required for Neighborhood F. <br /> Creek Flood Plain section and farm pump stations)will be used to convey the runoff to Creek improvements anticipated as part <br /> 290 15.1.6(1) Improvements Old River. N/A of subsequent community phases. None. <br /> 09/29/2000 SP-924(finaIFINDINGS) Page59 <br />