Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> 1 # Title Text Y/N/NA Com fiance' (COA) <br /> The improvements to Mountain House Creek will protect the <br /> Mountain House Specific Plan Area from flooding. No streambed alterations to the <br /> Creek Flood Plain existing Mountain House water course or riparian areas are <br /> 291 15.1.6(2) Improvements contemplated in this Specific Plan. N/A See#290 None. <br /> Mountain House <br /> Creek Flood Plain Chapter Seven: Recreation and Open Space, provides additional <br /> 292 15.1.6(3) Improvements provisions related to Mountain House Creek. <br /> Check Dams. Within the Specific Plan Area,the existing wetlands <br /> on Mountain House Creek shall be preserved by the construction of <br /> Mountain House small earthen check berms. The function of these berms shall <br /> 15.1.6(3) Creek Flood Plain provide periodic inundation of the wetlands and allow passage of <br /> 293 a Improvements flood events over the crest of the structures. N/A See#290 None. <br /> Basins. Interim or temporary retention/detention basins located <br /> Mountain House within the flood plain of the unimproved Mountain House Creek <br /> 15.1.6(3) Creek Flood Plain channel shall be separated from the flood flows to prevent'flood <br /> 294 b Improvements waters originating in the creek from entering the basin(s). N/A See#290 None. <br /> Freeboard Requirements. All berms or flood control channels shall <br /> be constructed below the finish grade of the surrounding <br /> development sufficient to meet County freeboard requirements. Analysis previously conducted,reviewed <br /> Mountain House Analysis of facilities, improvements,and flow rates for the down- by the County and CSD,and approved <br /> 15.1.6(3) Creek Flood Plain stream section of Mountain House Creek shall be provided prior to by the CSD as part of the CSD's Storm <br /> 295 c Improvements approval of the first Final Map. N/A Water Master Plan. None. <br /> Full Creek Design for the Segment Within Specific Plan I. Prior to <br /> the approval of the first Final Map for Specific Plan 1,analysis shall <br /> Mountain House be completed to show that the full creek design within Specific Plan <br /> 15.1.6(3) Creek Flood Plain I boundaries will function when completed as a stand alone drainage <br /> 296 1 d Improvements system. N/A See#295 lNone. <br /> 09/29/2000 SP-924(finaIFINDINGS) Page60 <br />