Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> # Title Text YM/NA Compliance (COA) <br /> Interim Detention Basins, Figure 15.2: Specific Plan <br /> Retention/Detention Basins, illustrates the approximate size and Sizes and locations of the basins in <br /> locations of interim detention basins required to comply with the compiance with the flow requirements of <br /> storm flow conditions of this Specific Plan I. Actual size, locations the Specific Plan have been proposed <br /> Best Management and configuration shall be determined during the design of the and approved by the CSD as part of the <br /> 302 15.1.7(b) Practices(BMP's) facilities and approval prior to the approval of the first Final Map. Y Neighborhood F Storm water Report. COA-94,9( <br /> Mosquito Abatement Implementation and Maintenance Schedules <br /> Implementation and maintenance schedules,as specified in <br /> Appendix 6-A of the Master Plan, shall be approved by the <br /> Mosquito Abatement District prior to construction of any storm <br /> Best Management drainage improvements involving open bodies of water within the To be required as part of subsequent <br /> 303 15.1.7(c) Practices(BMP's) Specific Plan Area. Y improvement plan review and approval. COA-29 <br /> FLOOD <br /> 304 15.2 PROTECTION <br /> As required <br /> PHASING OF by Master <br /> STORM DRAIN Plan <br /> COLLECTION Phasing. Phasing shall be implemented according to Master Plan Please see Master Plan Consistency Consistency <br /> 305 15.3(a) SYSTEM provisions. Y Findings. Findings. <br /> PHASING OF Incremental Construction. The storm drain collection system, BMP This criteria was utilized by the CSD and <br /> STORM DRAIN treatment facilities and flood protection improvements shall be County as part of the prior review and <br /> COLLECTION constructed in increments to match the needs and financial approval of the Neighborhood F Storm <br /> 306 15.3(b) SYSTEM capabilities of each phase of Specific Plan I. Y Water Report. None. <br /> CHAPTER <br /> SYSTEM: <br /> IMPLEMENTA- <br /> L <br /> 307 16 TION <br /> 09/29/2000 SP-924(finaIFINDINGS) Page62 <br />