Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> 1 # Title Text Y/N/NA Compliance (COA) <br /> Phased Storm Drainage Plan. In addition to the full creek design <br /> specified in d),above, interim storm drainage plans shall be <br /> approved for Neighborhood F and the south half of Neighborhood E <br /> prior to approval of the first Final Map in each neighborhood. <br /> Furthermore, prior to the approval of any Final Map outside of F and <br /> the south half of E,a detailed storm drainage plan for the Mountain <br /> House community shall be approved. This study shall include a plan <br /> for the improvements to Mountain House Creek sufficient to The CSD has approved a Neighborhood <br /> Mountain House determine the final creek design and open space boundaries and an F Storm Water Report,which addresses <br /> 15.1.6(3) Creek Flood Plain engineering report and schematic plan for all community-wide all protection improvement requirements <br /> 297 e Improvements drainage improvements. Y for the first Neighborhood. None. <br /> Downstream Flooding. Prior to submittal of the first Final Map for <br /> Mountain House Specific Plan I,the extent of flooding of downstream areas must be <br /> 15.1.6(3) Creek Flood Plain identified,and mitigation measures provided including deed <br /> 298 f Improvements restrictions. Y See #297 None. <br /> The applicant has indicated that two of <br /> Streambed Modification. Any streambed modification proposals three required 1603 Agreements have <br /> Mountain House within the boundaries of Specific Plan I shall be approved prior to already been approved by CDFG. The <br /> 15.1.6(3) Creek Flood Plain approval of the first Final Map. Actual streambed alteration thrid required agreement must be <br /> 299 g Improvements agreements will be required as specified in Section 7.2.3: Wetlands. Y approved prior to the first Final Map. COA-31, 34 <br /> The storm drainage system for the Specific Plan Area incorporates <br /> the Best Management Practices(BMP's)described in the Master <br /> Best Management Plan document. In addition to these items,the following policies <br /> 300 15.1.7 Practices(BMP's) and implementations apply to the Specific Plan. <br /> Channeling of Flows. After BMP treatment,the flows shall be These requirements have been included <br /> Best Management channeled into Mountain House Creek and to Old River as are the in the CSD-adopted Neighborhood F <br /> E30115.1.7(a) Practices(BMP's) pre-development flows. Y Storm water Report. COA-94,96 <br /> 09/29/2000 SP-924(finaIFINDINGS) Page61 <br />