My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE MASTERPLAN AND SPECIFIC PLAN i <br /> SAN JOAQUIN COUNTY MITIGATION MONITORING PROGRAM <br /> r•mpacf: i r' 1 <br /> rTiming orM <br /> Mitigation on easure Monitoring PesoFrequency o <br /> fReqIrrements Agency <br /> nsible' Monitoring' <br /> Many of the mitigation.measures from the Final Environmental Impact Report have been Incorporated Into the Master Plan,Master Plan Appendices,Specific Plan I,and Public Financing Plan. <br /> Some mitigation measures have been Included as Amendments to the San Joaquin County General Plan and/or the Mountain House Development Title. Compliance with these mitigation <br /> measures will occur as a function of the Implementation of these various plans. <br /> WATER SUPPLY <br /> M4.4.1-1 a)1f potential or proposed restrictions on diversion would cause the confirmed water Review of SJCDPW SP <br /> Inadequate raw water storage.(aciutles may supply to be Insufficient to serve the project as proposed In the Master Plan,then Subsequent <br /> result In Interruption of water service, the specific plans shall Identify additional water conservation/reuse measures to be Specific Plans. <br /> especially If restrictions on water diversion Incorporated Into the project to ensure that the demand would not exceed the <br /> were Imposed by Stale or Federal agencies. confirmed supply. <br /> M4.4.1-5 a)Industrial reuse of water treatment sludge shall be practiced to the maximum Plan review. MHCSD,SJCDPW DP for water <br /> Water treatment sludge disposal could extent possible.The Community Service District shall consider other disposal treatment plant <br /> adversely Impact local waterquality or options only If Industrial reuse were feasible. <br /> unnecessarily occupy scarce IandfiU-space. <br /> M4.4.1-e a)Chemical Selection and Facilities.Prior to the plants,chemicals associated with Review MHCSD,SJCDPW DPs for water and <br /> An uncontrolled release of hazardous water and wastewater treatment operations shall be carefully selected to minimize Plan/Englneers waste-water <br /> materials associated with water treatment the hazard.Chemical handling and storage facilities shall be designed to minimize Report treatment plants <br /> practices could potentially occur and Impact and effectively mitigate the potential for accidental releases,Including such features <br /> water resources and public health. as secondary containment,alarms,remote sensing Instrume�ls,and other safety <br /> features. <br /> WASTEWATER <br /> M4.4.2-1 a)Additional wastewater treatment processes shall be provided If unrestricted use Plan review. SJCDPW SP <br /> Inadequately treated reclaimed wastewater reclamation,Including irrigation on-site,InduslrlaVcommercial reuse,or surface <br /> could Impact local surface and groundwaters water discharge were Implemented. <br /> and public health. Insufficient reclamation <br /> sites could result in Illegal and Inappropriate. <br /> discharge of treated wastewater. <br /> b)The permit application for the wastewater treatment plant shall Include a Review SJCDPW 'DO.for treatment <br /> schedule for design,construction,and permitting for the plant to ensure that the Development `plant <br /> wastewater treatment and reclamalign facilities Would be,operational poor,to.the Permit application. <br /> approval of the first final subdivision map. <br /> c)Eacflpevelopment Permit for the wastewater treatment plant shall describe the Review SJCDPW , DP for treatment) <br /> mechanism by which the construction of additional facilities for incremental Development plant <br /> expansion In treatment capacity shall be completed before the existing capacity Is Permit application.; <br /> exceeded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.