Laserfiche WebLink
Timing or <br /> Monitoring Person/Agency Frequency of <br /> Mitigation Measures Requirements Responsible Monitoring <br /> TRAFFIC4:Tracy Boulevard(north of Lammers Road)shall be widened,as necessary,from two <br /> to four travel lanes to accommodate cumulative,regional traffic volume increases.The County shall Review TIMF status, SJCCDD Annual monitoring <br /> initiate discussion and coordinate with the City of Tracy regarding the improvements. This coordination efforts with SJCDWP and assurance that <br /> widening project shall be added to the San Joaquin County TIMF once improvement designs and Tracy and annual improvements <br /> cost estimates are completed;then development within Mountain House shall pay its fair share of monitoring of levels of completed prior to <br /> the improvements through participation in the TIMF by paying TIMF fees at issuance of building service. LOS D being <br /> permits. reached. <br /> "TRAFFIC-5:One of the following options shall be implemented for New Grant Line Road when <br /> constructed east of Byron Road:Option 1:Widen Grant Line Road from four to six lanes,as Review TIMF status, SJCCDD Annual monitoring <br /> necessary,to accommodate cumulative,regional traffic volume increases.The County shall initiate County LOS standard, SJCDPW and assurance that <br /> discussion and coordinate with the City of Tracy regarding financing the improvements should the coordination efforts with LOS standard <br /> City of Tracy adopt the widening project in the future. Development within Mountain House will Tracy and annual changed or <br /> then pay its fair share of the improvements through participation in any County financing,such as monitoring of levels of improvements <br /> the TIMF,by paying any such fees at issuance of building permits.Option 2:Change the level of service. completed prior to <br /> service standard for the segment similar to Mitigation Measure M4.125(c)in the Master Plan EIR. LOS D being <br /> This allows the use of LOS D rather than LOS C as the threshold of significance. reached. <br /> NOISE <br /> NOISE-I:Soundwalls shall be included at the locations shown in Figure 5 to reduce the outdoor <br /> noise level to an Ld„of 60 dB unless the planning authorities deem that the maximum wall height is Review specific noise SJCCDD Prior to adoption of <br /> to be 7 feet. If this is the case,the residents shall be notified that the outdoor sound level has not control measures and MHCSD first final map for <br /> been mitigated to the design goal of an Ld„of 60 dB. Alternatively,an exterior noise level standard standards to be finalized noise control <br /> of an Ldn of 65 dB(as permitted in the Master Plan)would allow the recommended noise wall prior to adoption of first measures and <br /> along DeAnza Boulevard to be reduced to 7 feet in height and the wall along Mascot Boulevard to final map. Review at time standards,after <br /> be 7 feet or less. The final wall heights and locations shall be determined prior to the issuance of of sale notifications to grading and house <br /> building permits and after the grading and house location plans have been developed. residents unless County location plans <br /> Board of Supervisors developed and before <br /> selects Ldn of 65 dB and issuance of building <br /> reduced wall heights permits for <br /> allowed. notifications. <br /> As an alternative to constructing taller walls,the homes could be set back farther from DCAn7a <br /> Boulevard and Mascot Boulevard. Increasing the setback would allow a lower height noise wall to <br /> achieve the desired exterior noise environment. However,such setbacks could reduce overall <br /> project density if lot sizes were not reduced,and thus impact(lie project's goals for affordable <br /> housing,non-auto related transportation and associated benefits regarding air quality and noise. <br /> NOISE-2: Mechanical ventilation in homes shall be supplied for the two rows of lots on the east <br /> side of Central Parkway,two rows west of DeAnza Boulevard and north Mascot Boulevard and to Review at time of building SJCCDD Prior to issuance of <br /> the first row of homes south of Mountain House Boulevard. permit application. building permits. <br />