Laserfiche WebLink
Implementation <br /> DESIGN REVIEW PROCESS <br /> STEP 4: STEP 5: <br /> DESIGN REVIEW FINAL DESIGN REVIEW/ <br /> The purpose of this step Is to develop the All Architectural, Engineering and Land- CONDITIONAL APPROVAL <br /> specific designs for the architectural and scape Architectural Plans shall be prepared The purpose of this step Is to assure that <br /> landscape architectural, and civil engineer- by professionals licensed to practice in the the speclf7c designs for the architectural <br /> Ing elements of the project. State of California. No non-licensed design and landscape architectural elements of <br /> work shall be permitted. Licensed build- the project approved In the previous phase <br /> Upon receipt of and confirmation with the Ing designers may be used only with the are Included in the final construction docu- <br /> DRC's Preliminary Design Review Memo- special approval of the DRC. ments; and to review the resolution of all <br /> randum, detailed project plans shall be outstanding Items from the previous <br /> prepared and submitted to the DRC for phase. <br /> Design Review. Plans shall be a progres- <br /> sion of the approved plans and direction All Items submitted as part of Final Design <br /> established during Preliminary Design Re- Review must be consistent with the design <br /> view. Horizontal and vertical dimensional concepts approved during previous sub- <br /> control Is critical during this phase. All of mittals, which must be clearly evident In <br /> the consultants must use the same hard- the final construction documents. Previous <br /> lined or computer-generated site plan approvals which were made at the Prelimi- <br /> bases. Consultant coordination is essen- nary Design and Design Review steps shall <br /> tial to ensure that the site systems are stand. Only changes,corrections and modi- <br /> mutually supportive. fications will be reviewed and approved In <br /> Design Review will provide the opportunity the Final Design Review. <br /> for the Builder to proceed directly to the Builders shall be notified In writing of the <br /> preparation of working drawings for all findings for the Final Design Review by the <br /> aspects of the project site. Within 15 work- DRC. Notification will be made within 15 <br /> Ing days following receipt of a complete working days after receipt of all required <br /> submittal the DRC will prepare and sub- submittal materials. Suggestions may be <br /> mit to the Builder a written memorandum made to assist the Builder in making ad- <br /> of either approval or approval with appro- justments which the DRC finds necessary. <br /> priate modifications. In the event that sig- <br /> nificant modifications are necessary, a No submittal to San Joaquin County may <br /> second design review meeting will be be made until receipt of notice of Final <br /> scheduled by the DRC, focused on those Approval by the Builder. <br /> major changes. <br /> Chapter Two <br /> 6 <br />