Laserfiche WebLink
MOUNTAIN HOUSE GENERAL PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Finding of Fact/Analysis Approval <br /> 1 Heading# Title Text Y/N/NA and Evidence of Compliance (COA) <br /> All parcels available for development will be accessed <br /> Fire Safety and by roads built to County standards. Cul-de-sac lots <br /> Law dead-ending onto collectors or arterials will provide <br /> Enforcement All development shall have adequate access for fire alternate access for fire fighting and emergency <br /> 79 V,C,P(5) (Fire Safety) fighting and emergency equipment. Y equipment via paseos. None. <br /> To ensure that development design fosters a sense of <br /> community and incorporates defensible space design <br /> concepts, the proposed project will be subject to a two- <br /> tiered design review process--a developer controlled <br /> design consistency review process and a County/CSD <br /> controlled design consistency+F104 review process. <br /> All development will be in accordance with a set of <br /> developer mandated design guidelines that includes <br /> standards for site planning, architecture, landscape <br /> architecture,and community elements. Separate design <br /> manuals have been prepared for single-family <br /> residential,multi-family residential,and <br /> commercial/office/business park uses. In addition to <br /> these protections,development will also need to be in <br /> Fire Safety and conformance wiht the CSD Design Manual, all <br /> Law applicable design policies and requirements of the <br /> Enforcement Development design should foster a sense of Master Plan,applicable CC&R's,and the County's <br /> (Law community and incorporate defensible space design Development Title, which includes the Mountain <br /> 80 V,C,P(8) Enforcement) concepts. Y House Development Title. COA-2, 5,6 <br /> 09/29/2000 Page 24 MHGP.CHECKLIST9-28-2000 <br />