Laserfiche WebLink
Pacific G and Electric Company °040 We=I'ne <br /> P.O.Box 930 <br /> Srodaon Di ision Stoc3=n,CA 95701 <br /> March 8, ZWO <br /> a. Mr. Eric 'reed.-Bose j,;F R 3 2000 <br /> Trimark qommurdties <br /> 3120 Tray Boulevard, Suite A Ge�'eio�r�°�l Dem. <br /> Cal f., 95376 <br /> Dear Eric <br /> This is to confirm that the "Joint gas pipeline relocation plan" subplan mineders tb PG E's <br /> Lynn Sutt n on June 23, 1999 is acceptable to PG&E. This p <br /> existing -mission pressure natural gas line which runs along Mountain House <br /> in a North Test direction to Byron the This <br /> Parkway crosses through the project <br /> existing sion lint Will be replaced vrith dism-bution pressure lines as these <br /> new lines re installed in the project. Tac "Joint gas pipeline relocation plan shows <br /> the propo ed phasing of how this will occur. <br /> The transi nission line will be converted to distribution pressure when the new <br /> reg lator tation is installed at the north-west corner of Mascot Blvd. and Mounrain <br /> House Pkway. As shown in the plan, sections of the existing line must remain in <br /> place unci the new distribution system is installed to points that intersect with the <br /> existing 1i e. As these sectioru of new line are installed, the corresponding section of <br /> old- tr smission line will be abandoned in place, with no cost to PG&E. <br /> Sir1: ely. <br /> Donald J. Helper <br /> Service PLO,", Supervisor <br /> cc Jim Leonard / Mountain House CSD <br /> G o Cerruti I Precision Planning <br /> Lynn Sutton <br />