Laserfiche WebLink
MOUNTAIN HOUSE GENERAL PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Finding of Fact/Analysis Approval <br /> I Heading# Title Text Y/N/NA and Evidence of Compliance (COA) <br /> The proposed project is subject to Master Plan policies <br /> to control dust during construction, including the <br /> requirement that construction practices comply with <br /> the provisions of the SJVUAPCD. It is also subject to <br /> other Master Plan policies for reducing impacts to air <br /> quality,the TDM program,the Transit Plan,tdhe <br /> Area Source Improvements. The County shall support CMP,and the following agreed to conditions of <br /> measures to reduce area source pollution including: approval specified in the Mountain House <br /> (a) Implementing dust control practices for Neighborhood 7"Project Initial Study and Mitigated <br /> construction sites;(b)requiring efficient combustion Negative Declaration, SCH#900020776: AIR-3,AIR- <br /> controls on fireplaces;(c)requiring projects to mitigate 4,AIR-5,and AIR-6. In addition,residential areas are <br /> potential high levels of air pollutants;and(d) to be protected from dust emissions from agricultural <br /> protecting residential areas and sensitive receptors operations by means of an agricultural buffer and edge COA-91,92, <br /> 104 VI,E,1(5) Air Quality such as agriculture from air pollution sources. Y treatments(see#99). 193 <br /> 09/29/2000 Page 31 MHGP.CHECKLIST9-28-2000 <br />