Laserfiche WebLink
MOUNTAIN HOUSE GENERAL PLAN CONSISTENCY FINDINGS <br /> Project Action or, <br /> Consis- Conditions o <br /> Section tency Finding of Fact/Analysis Approval <br /> 1 Heading# Title Text Y/N/NA and Evidence of Compliance (COA) <br /> The storm drainage system for the proposed project <br /> incorporates Best Management Practices(BMP)to <br /> prevent contaminated drainage water from entering <br /> sensitive waterways. Prior to issuance of the first <br /> building permit,a storm water management program <br /> (SWMP)is to be developed to reduce the discharge of <br /> pollutants from the storm sewer system to the <br /> maximum extent practicable and to protect water <br /> quality in the receiving waters(see Master Plan <br /> implementation measure 15.7(a).) In addition, <br /> Trimark has agreed to the following conditions of <br /> approval from the Mountain House Neighborhood 7" <br /> Water Project Initial Study and Mitigated Negative <br /> Resources and Declaration, SCH#900020776 to protect surface <br /> Quality(Water Surface water and groundwater quality shall be water and groundwater quality: HYDRO-1, HYDRO- COA-94--97, <br /> 108 VI,F,P(2) Quality) protected and improved where necessary. Y 2, HYDRO-3, HYDRO-6,and HYDRO-8. 101 <br /> Water <br /> Resources and <br /> Quality <br /> (Management o <br /> Water <br /> VI,F,1(2)(e) Resources) All new water systems shall be metered. Y The CSD will meter its water system. None. <br /> 09/29/2000 Page 33 MHGP.CHECKLIST9-28-2000 <br />