My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
are grown and harvested. Trimark plans to cease agricultural operations on a phased basis in the <br /> immediate vicinity of the proposed project. On-going irrigation within the proposed project and on <br /> lands west of the proposed project would be discontinued as the proposed project develops. <br /> In order to buffer ongoing farming operations from urban development, Trimark would establish a <br /> minimum 100-foot setback between the ultimate buildout boundary of the proposed project and <br /> the ongoing agricultural operations to the north, west, and south. In some cases, the setback may <br /> be over 200 feet and sometimes as great as 1,000 feet(see Figure 8). For lands where <br /> agricultural operations are ceased, Trimark proposes to plant the fallow areas with a low- <br /> maintenance groundcover, such as alfalfa, in order to minimize dust impacts to future residents <br /> and to create a natural barrier between farm operations and development. <br /> In addition to establishing a setback buffer, two other edge treatments would be implemented as <br /> part of the neighborhood improvements. <br /> The first edge treatment would occur as part of Arterial roadway construction. This activity <br /> consists of the installation of roadway landscaping and trees within the roadway corridor. These <br /> installations would occur on a phased basis with development of the proposed project. However, <br /> at buildout of the neighborhood, the proposed project would include, at a minimum, the installation <br /> of trees, shrubs and groundcover within all of the Arterial road medians and the inboard edge of <br /> streetscapes adjacent to development. <br /> The second edge treatment, the Community East Edge along Mountain House Parkway, as <br /> described in the Master Plan, would be installed on a phased basis as both construction of <br /> Mountain House Parkway and the adjacent private development along the roadway occurs. This <br /> edge treatment would consist of west edge streetscape plantings consistent with the Master Plan <br /> and CSD Design Manual, as well as future installation of median and east edge plantings as part <br /> of ultimate development of Mountain House Parkway. <br /> 11. Agricultural Irrigation Facilities <br /> Several BBID and Trimark owned farm irrigation facilities traverse the proposed project. These <br /> include BBID irrigation canals and drainage conveyance pipelines, and Trimark owned distribution <br /> pipes and ditches, as well as surface runoff tail water ditches. In addition, two subsurface pipes <br /> traverse the proposed project along Mountain House Parkway. These pipes, owned and operated <br /> by BBID convey both subsurface ground water collected beneath the proposed project site and <br /> adjacent parcels, and tail water runoff from the surface application of irrigation water on fields. <br /> Irrigation service to the proposed project would be terminated back to where the BBID canal <br /> crosses Mountain House Creek. Pipes from the new terminus would be extended beneath the <br /> creek to continue service to the agricultural fields north of the proposed project. Existing BBID <br /> subsurface pipes would be intercepted along the south of the proposed project, where the waters <br /> from both the ground water and tail water pipes would be connected to, and discharged into, the <br /> proposed storm water pipes to be constructed within Mountain House Parkway. Existing <br /> groundwater conveyance pipes located north of the proposed project along Byron Road would be <br /> left intact to continue subsurface drainage for farm fields along Byron Road. <br /> 12. Noise <br /> To reduce outdoor noise levels to 60 dB Ldn within the proposed project, as required by the <br /> Master Plan for residential areas, soundwalls at the locations and the heights shown in Figure 9 <br /> are proposed to be built. Soundwalls at these locations and heights include the following: A 6-foot <br /> soundwall along the south side of Mountain House Boulevard from De Anza Boulevard to the alley <br /> -12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.