Laserfiche WebLink
MOUNTAIN HOUSE MASTER PLAN <br /> ImprovementsTable 9.2 <br /> County Arterial Road <br /> Road Segment Lanes Trigger DLI's <br /> Patterson Pass, Byron to 1-205 To 4 4,100 <br /> Patterson Pass,Cea�alW 2Q5 Von Sosten to 1-205 To 6 9,660 <br /> Patterson Pass,6eatF@1 te4- Von Sosten to 1-205 To 8 12,080 <br /> ; <br /> Patterson Pass,Pl@iR to RyraaRe� Von Sosten to Mascot To 6 12,080 <br /> Patterson Pass, I-205 to I-580 To 4 12,080 <br /> Grant Line, Patterson Pa:to <br /> to Alameda County To 4 8,050 <br /> Grant Line,Patterson Pato Byron Road _ To 4 11,260 <br /> Grant Line,Alameda line 1-580 To 4 9,660 <br /> Byron Road, Patterson Pass to Marina Boulevard To 4 , 0 <br /> Byron Road,Marina Boulevard to Alameda County To 4 122,0080 <br /> To 4 9,660 <br /> Byron Road, Patterson Pass to Grant Line To 6 12,080 <br /> Byron Road,Patterson Pass to Wicklund <br /> Note Patterson Pass Road has been renamed Mountain House Parkway. <br /> e) Community Participation. If warranted by the traffic monitoring program, or, if initiated <br /> by others, the community shall participate in the traffic studies and improvement <br /> measures for improvements not listed in Table 9.2, including the following: Eleventh <br /> Street, Byron Road (south of Grant Line Road), existing Grant Line Road (east of <br /> Byron Road), new Grant Line Road (realigned section east of Byron Road), grade <br /> separation at Grant Line Road crossing the Southern Pacific railroad tracks (City of <br /> Tracy), Middle Road extension (from Gold Rush City to Mountain House), (Cities of <br /> Lathrop and Tracy), Altamont Pass Road (Alameda County), Byron Highway (Contra <br /> Costa County). <br /> fl Operation and Safety Improvements. The community shall, to the extent of its fair <br /> share, participate in upgrading pavement sections and/or safety improvements (e.g., <br /> standard pavement widths and paved shoulders) when it is determined by the County <br /> to be the primary new traffic contributor, on rural roads, including Bethany, Kelso, <br /> Hansen, Von Sosten, Reeve, and Middle Roads, and Tracy Boulevard where <br /> necessary to alleviate additional traffic caused by the project within the County. <br /> g) Construction Truck Management Plan. The Construction Truck Management Plan <br /> shall be administered by the MHCSD. It shall include identification of the preferred <br /> routes for trucks bringing construction materials to the site, and shall also include <br /> measures to ensure compliance by General Contractors. <br /> h) Grant Line Road. When traffic reaches 5000 ADT, Grant Line Road (from Byron Road <br /> to 1-580) shall be studied to determine whether it meets current road standards or has <br /> deficiencies not identified under previous model assumptions. The study shall be <br /> prepared by the MHCSD and approved by the County. <br /> i) Noise Study. Prior to the widening of Grant Line Road in the vicinity of Grant Line <br /> Village, the CSD shall prepare a noise study to determine future noise impacts and to <br /> identify measures which can mitigate, if feasible, exterior residential noise levels to 65 <br /> dB Ldn. Any approved mitigation measures shall be implemented at the same time <br /> the road widening is constructed. <br /> CHAPTER NINE PAGE 9.12 <br />