Laserfiche WebLink
anticipated for Neighborhood F fulfill housing needs for nine (9) out of fifteen (15) total anticipated <br /> housing price categories envisioned in the Master Plan. <br /> XI. JOBS TO HOUSING BALANCE <br /> The Master Plan and Affordable Housing Program for Mountain House anticipated a lag in employment <br /> generating land uses behind the construction of residential housing. However both programs have <br /> specified performance objectives for the provision of employment along with residential development to <br /> ensure a reasonable jobs to housing balance at build-out of the community. <br /> Although not required by the Master Plan, the proposed Tract 2925 map includes the subdivision and <br /> infrastructure services for approximately 35 acres of industrial land and 30 acres of professional office <br /> land to facilitate the construction of employment generating uses early on in the project. In addition, the <br /> K-8 school, Neighborhood Commercial and Community Commercial sites will each generate additional <br /> jobs overtime. The Master Plan estimates the anticipated population per household for each land use area <br /> on Table 3.1. The Master Plan also estimates the jobs per acre for each land use type (Table 3.1) <br /> Further, the Master Plan indicates that the average assumed working resident per household is projected <br /> to be 1.44 (Page 3.55). The Master Plan then sets a jobs to housing goal of 0.99 jobs per working resident <br /> (Page 3.55). Based on preliminary projections utilizing Master Plan statistics, the first neighborhood will <br /> eventually generate the following statistics: <br /> • Population: 3,852 <br /> • Full Time Working Residents: 2,100 <br /> • Jobs Created: 3,006 <br /> When fully absorbed by the market, the first neighborhood at buildout would include opportunities for <br /> approximately 3,000 full time jobs, while generating approximately 2,100 full time working residents. <br /> This amount of jobs would satisfy the Master Plan jobs to housing balance requirement of 0.99 jobs for <br /> each working resident, for up to :*dwelling units <br /> of the <br /> community. <br /> % <br /> XII. NEIGHBORHOOD DESIGN THEME <br /> The Neighborhood Design Theme established for Wicklund (Neighborhood -F") utilizes the "Prairie" <br /> architectural vernacular. The Design Theme for Neighborhood "F" is taken from an overall palette of <br /> styles prominent during the "Arts and Crafts" era of the early 26 Century. The Primary neighborhood <br /> theme will be used for the K-8 School,Neighborhood Commercial and Neighborhood Entries, and will be <br /> used along with three other styles for Residential architecture. Architectural styles for Industrial, <br /> Commercial and Office will use different styles also used during the Arts and Crafts period. Please see <br /> Sections 21,22 and 23 of this Binder for architectural images and descriptions. <br /> XIII. ARCHITECTURAL REVIEW PROCESS <br /> Trimark Communities will be creating and implementing a Design Review Committee process by which <br /> all development projects controlled by Trimark Communities will be reviewed and approved. All such <br /> projects will be reviewed for consistency with a set of Design Guidelines, which include standards for <br /> Site Planning, Architecture, Landscape Architecture, and Community Elements. Separate Design <br /> Manuals have been prepared for Single Family Residential, Multi-Family Residential, and <br /> Commercial/Office-Business Park land uses. This Design Review process will occur prior to any <br /> submittals to either the CSD or County for any implementing building or use permits. <br /> vLUOR SUBDMSIO\-TRACT 2925 PROJECT DESCRIPTION <br /> Pace 8 <br />