Laserfiche WebLink
completion of construction of the interim sports fields must occur prior to the issuance of the 800h <br /> dwelling unit permit. <br /> In accordance with these requirements, the following is proposed along with development of <br /> Neighborhood F: <br /> • Funding and/or construction of the Neighborhood Park, per the Master Plan and Specific Plan <br /> requirements(Development Fees), <br /> • Funding and/or construction of interim sports fields as required by the Master and Specific Plan by <br /> the 800`'dwelling unit, for the subdivision area(Development Fees), <br /> With regard to the provision of the interim sports fields, because these facilities are interim in nature, <br /> Trimark Communities and the CSD have agreed that the access to the facilities and the facilities <br /> themselves will be delineated, improved and conveyed through an easement on the lands where they are <br /> to be located. The CSD will then operate and maintain the improvements in accordance with the future <br /> easement. Once the interim facilities are no longer needed, the easement will be quitclaimed back to <br /> Trimark Communities. The land will not be dedicated since it will be developed with uses per the Master <br /> Plan when permanent sports fields are constructed. The specific delineation, and granting of the <br /> easement for the area will occur in accordance with the Master Plan, once the facilities have been <br /> designed and constructed per CSD standards. <br /> MAJOR SUBDMSION-TRACT 2925 PROJECT DESCRIPTION <br /> Page 15 <br />