MOUNTAIN HOUSE NEIGHBORHOOD'F"PROJECT INITIAL STUDY <br /> Road,the applicant has proposed an interim discharge channel, a deflection berm, and a flood diversion bend <br /> (see Figure 3). An interim flood protection berm is also proposed north of Byron Road just north of the <br /> proposed water treatment plant. <br /> Roads and Transit Improvements. Roadway improvements for the project are expected to be identified <br /> by way of conditions of approval for this application, and the specific improvements are envisioned to be built <br /> in phases according to levels of service and access requirements for each incremental phase of the subject <br /> subdivision. Actual improvements for the site are anticipated to be constructed either by the Mountain House <br /> Community Services District(MHCSD)via developers'payment of roadway impact fees, or by the applicant <br /> with fee credits being taken against actual improvements being constructed. The proposed improvements for <br /> project-related roads(see Figure 2)include the following: <br /> Mountain House Parkway. The Master Plan calls for Mountain House Parkway(north-south arterial)to be <br /> constructed ultimately to a minimum of four lanes by the buildout of the entire community. However, the <br /> traffic study used by the applicant for this(Neighborhood"F")project calls for initial phased construction of <br /> the two southbound lanes in the vicinity of the project. This road currently has one southbound and one <br /> northbound lane. The phasing would also include proper turning movements at first phase intersections, and <br /> transition lanes where the phased improvements revert to existing conditions along this road both north and <br /> south of the proposed project (see Roadway Improvement Plan available at the San Joaquin County <br /> Community Development Department). <br /> De Anza Boulevard. The Master Plan calls for the ultimate construction of four lanes on De Anza Boulevard <br /> (north-south arterial)to occur on a phased basis during community buildout. T'he traffic study prepared for <br /> the project calls for a minimum of two lanes between Mascot Boulevard and Mountain House Boulevard <br /> along the adjacent industrial and office commercial parcels for access considerations only. No warrants for <br /> any other through traffic considerations or other level of service considerations are called for during the <br /> buildout of this subdivision, according to the Optrans traffic study. Specific intersection improvements where <br /> De Anza connects to other project roadways may be appropriate based on traffic safety considerations. <br /> Mountain House Boulevard. The Master Plan calls for the ultimate construction of four lanes for this east- <br /> west arterial, occurring on a phased basis during community buildout. The Optrans traffic study calls for a <br /> minimum of two lanes between Mountain House Parkway and the nearest collector that may be required for <br /> access purposes. As phases of the subdivision progress, Mountain House Boulevard will ultimately be <br /> extended to Central Parkway. Specific intersection improvements where Mountain House Boulevard connects <br /> to other project roadways may be appropriate based on traffic safety considerations. <br /> Central Parkway. This north-south arterial at the west edge of the project site does not currently exist. The <br /> Optrans traffic study concluded that no improvements for traffic safety purposes are required for Central <br /> Parkway as part of this subdivision proposal. However, the traffic analysis contained herein for this Initial <br /> Study recommends improvements to Central Parkway as part of the project. The Mountain House Community <br /> Services District (CSD) may also require such improvements or bonding as an alternative to actual <br /> construction by the applicant. <br /> Mascot Boulevard. For this east-west arterial at the south end of the project site, the Master Plan calls for <br /> the ultimate construction of four lanes occurring on a phased basis during community buildout. The traffic <br /> study prepared for the applicant calls for a minimum of two lanes between Mountain House Parkway and the <br /> nearest collector which may be required for access purposes. As phases of this subdivision progress, Mascot <br /> Boulevard will ultimately be extended to Central Parkway. Specific intersection improvements where Mascot <br /> Boulevard connects to other project roadways may be appropriate based on traffic safety considerations. <br /> c QOBSWC NrrLAL MUDY\PNALNmALS=Y•PART1.1)0C Ilrsaoo> 13 II. PROJECT DESCRIPTION <br />