Laserfiche WebLink
MOUNTAIN).-LOUSE NEIGHBORHOOD"F"PROJECT INITIAL STUDY <br /> Hourly 2010 Buildout i IS <br /> Dir. Dir. Time of LOS <br /> Road Location Lanes Capacity Da Volume V/C LOS EIR Mitigation w/Mit. <br /> West of Tracv Boulevard 2 1,500 AM 1,150 0.77 D Safety and operational improvements(increase C <br /> 1300 087 p capacity to 1,800) <br /> , . <br /> PM C <br /> Tracy Boulevard North of Lammers Road 1 900 AM 760 0.84 <br /> PM 860 0.950 <br /> Middle/Arbor East of Tracy Boulevard 1 750 AM 200 0.27 A No longer a significant impact. A <br /> PM 140 0.19 A A <br /> Stanford Extension East of Paradise Road 2 1,800 AM n/a n/a n/a Parallel roadway not in revised 2010-roadway n/a <br /> network. <br /> PM n/a n/a n/a n/a <br /> =Impact identified in Master Plan EIR that is no longer significant. <br /> = =New impact not identified in Master Plan EIR. <br /> Note: Bold letters denote significant impacts related to LOS. <br /> Source: Master Plan EIR Technical Appendix and Dowling Associates,Inc. <br /> C4OWSWINMAL."IDYTMALINMAsnmr,rARn1xxr:vao> 69 V.F. TRANSPORTATION/TRAFFIC <br />