Laserfiche WebLink
MOUNTAIN HOUSE NEIGHBORHOOD' 'PROJECT INITIAL STUDY <br /> G. AIR QUALITY <br /> The project site is within the northwestern corner of the San Joaquin Valley Air Basin which is regulated <br /> by the San Joaquin Valley Unified Air Pollution Control District(SJVUAPCD). This air basin has a high <br /> potential for air pollution due to geography and climate, and is a nonattainment area(has not attained the <br /> State or Federall ambient air quality standards)for PM-10 (particulate matter less than 10 microns in <br /> diameter)and ground-level ozone. The project area is in attainment of all other State and Federal <br /> standards. The SJVUAPCD has been required to adopt regional plans to meet the Federal and State <br /> standards. The SJVUAPCD has adopted Federal nonattainment plans for PM-10, carbon monoxide and <br /> ozone. The State-required nonattainment plan for ozone and carbon monoxide, the 1991 Air Quality <br /> Attainment Plan for the air basin, was approved by the State Air Resources Board in 1992 (SJVUAPCD, <br /> 1992). <br /> The Mountain House Development Agreement does not include any specific measures related to air <br /> quality. The Findings adopted for the 1994 EIR determined that the two potentially significant air quality <br /> impacts that could be mitigated would be related to conflicts with agricultural uses at the western edge of <br /> the overall site and construction-related dust. Compliance with rules of the SJVUAPCD would mitigate <br /> any impacts related to dust from project construction. Proposed edge treatments for the area outside of <br /> the project site were found to adequately mitigate potential conflicts with agricultural operations. Potential <br /> odor conflicts and carbon monoxide increases were identified as less than significant. Impacts to regional <br /> air quality(PM 10 and ground-level ozone)due to indirect project emissions were identified as significant. <br /> Measures to reduce these emissions were identified;however, the impact was identified as significant and <br /> unavoidable and the necessary findings were made at the time of certification of the 1994 EIR. <br /> In addition to being subject to the rules of the SJVUAPCD, the project is also subject to the requirements <br /> of the County's Congestion Management Plan(CMP)which was adopted in 1991. A major element in the <br /> Air Quality section of the Master Plan is the objective to reduce trips associated with single-occupant <br /> vehicles. A Transportation Demand Management(TDM) and Transit Plan was adopted to identify <br /> implementation measures for increased transit use, reduced single-occupant vehicle use, and increased <br /> non-vehicular transportation throughout the Mountain House New Community. In addition, the Master <br /> Plan identifies the following: 1)the need for the project to comply with regulations of the SJVUAPCD; <br /> 2)the need to reduce emissions associated with fireplaces, water heaters, lawn equipment and barbecues; <br /> 3)the need for specific implementation measures related to provision of natural gas lines for barbecues, <br /> outlets for future use of electrical vehicles, restrictions on fireplaces, and use of low nitrogen oxide(NOx) <br /> emitting and/or high efficiency water heaters. These measures are discussed below. <br /> At the time of certification of the 1994 EIR, a Statement of Overriding Considerations was prepared for <br /> significant impacts to regional air quality that could not be mitigated to a less-than-significant level by <br /> mitigation measures. These same significant and unavoidable impacts would remain for this project but <br /> do not require additional findings or the preparation of an EIR because the earlier EIR adequately <br /> addressed the issue. The proposed Neighborhood"F"project would not increase impacts identified <br /> earlier. <br /> Conditions of approval that were designed to reduce regional air quality impacts associated with buildout <br /> of the Master Plan were recommended. These measures were included in the Mountain House Master <br /> Plan, the TDM Program and Transit Plan, and were also included as mitigation measures in the 1994 <br /> CUOMSI MAL FWY\nNAL[Nm LM1MY-eaen-DX(7/200) 74 VG. AIR QUALITY <br />