My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE NEIGHBORHOOD"F"PROJECT INITIAL STUDY <br /> Mountain House Master Plan and Specific Plan 1 Final EIR. The applicable mitigation measures of the <br /> TDM Plan are listed in Table V-15. <br /> Table V-15 <br /> RECOMMENDED AIR QUALITY MITIGATION MEASURES WITHIN TDM PLAN <br /> Measuresi Timing of Monitoring Compliance <br /> 1. Ensurance of designated Transportation Demand Management 1. At time of on-site CSD office and prior to approval <br /> (TDM)Coordinator. of Final Subdivision Ma <br /> 2. CC&Rs to address employer participation in Transportation 2. Prior to approval of Final Subdivision Map. <br /> Management Association(TMA)for all employers. <br /> 3. Annual monitoring as per TDM Plan and compliance with other 3. Within first year of occupancy. <br /> TDM measures. <br /> 4. Establishment of telecenter facilities upon completion of 2,500 4. At completion of 2,500 homes and prior to issuance <br /> homes. i of building permit for 2,501"home. <br /> 5. Establishment of TMA at time of 2,500 employees present 5. Prior to issuance of building permit for any square <br /> within site. footage that could result in more than 2,500 <br /> employees based on Specific Plan multipliers) <br /> 6. Fitness facility for buildings greater than 75,000 sq.ft.and drop 6. Prior to issuance of building permit for commercial <br /> off areas for vehicles in all business park buildings. building eater than 75K s .ft. <br /> 7. As per Master Plan(p. 10.6),all homes shall have natural gas 7. Prior to issue of fust building permit <br /> lines to backyards to encourage natural gas barbecues;each <br /> garage shall be equipped with 220 volt electrical outlets for <br /> recharging electrical automobiles and electric outlets shall be on <br /> outside walls to service outdoor equipment;all residential water <br /> heaters shall be low nitrogen oxide(NOx)emitting and high <br /> efficiency;no residence shall have more than one fireplace unless <br /> designed to be natural gas appliance of a zero clearance design. <br /> 8. Availability of TDM information to all employees,as provided 8. Prior to issuance of fust building permit for non- <br /> by TDM Coordinator or TMA(see p. 1.13 of TDM Plan). residential building <br /> 9. Adequate bicycle storage in non-residential buildings as per 9. Prior to issuance of first building permit for non- <br /> TDM Plan. residential building <br /> 10. Assurance that taxi or dial-a-ride service is available after first 10. Prior to issuance of building permit for 26 home <br /> 25 homes are occupied see p.2.3 of TDM Plan). <br /> 11. Review of need for fixed-route transit service prior to building of 11. Prior to issuance of building permit for 1,001"home <br /> 1,001"home as per page 2.3 of TDM Plan). <br /> 12. CSD to work on Mountain House stop at Mountain House 12. Prior to issuance of building permit for 1,001"home <br /> Parkway ark-n-ride lot once more than 1.000 homes occupied. <br /> 13. Development of park and ride lots. 13. Prior to issuance of first building permit <br /> 14. Provision of bus turnouts and shelters at school and 14. Prior to approval of Final Subdivision Map or <br /> Neighborhood Center(as per page 2.11 of TDM Plan)and every building permits for school and Neighborhood <br /> 1/4 to 1/2 mile as per page 2.11 of TDM Plan). I Commercial center <br /> 15. Assurance that preferential parking is provided for car/vanpools 15. Prior to issuance of building permit for any <br /> at commercial office and industrial buildings. commercial office or industrial building <br /> C.voebl CUNmAL snmY\eMAuNrnAL nmY.FARtz.D0C(7110/00) 75 VG. AIR QUALITY <br />
The URL can be used to link to this page
Your browser does not support the video tag.