My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004853
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
7999
>
2600 - Land Use Program
>
PA-0200409
>
SU0004853
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:16:24 PM
Creation date
7/1/2022 4:36:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004853
PE
2611
FACILITY_NAME
PA-0200409
STREET_NUMBER
7999
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
APN
24808014, 16, &
ENTERED_DATE
2/22/2005 12:00:00 AM
SITE_LOCATION
7999 W LINNE RD
RECEIVED_DATE
2/25/2002 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT-10-2002 03 :02 PM IJDO, INC. 209 835 9022 P. 01 <br /> I,inrre Estates, 1,I,C <br /> 7701 Bates Road <br /> Tracy, CA 95304-9154 <br /> Phone: 20.9/835-7284 — Pax: 209/8,35-9022 <br /> October 10, 2002 <br /> QNF, PAGE FAXED INCLUDING THIS PAGE to 468-29" <br /> Tom Gau, Deputy Director <br /> San Joaquin County Department of Public Works <br /> Stockton, CA <br /> Retarding: Traffic Study—Linne Estates,Phase 41 PA-0200409(SU) <br /> Dear r1 om: <br /> On July 22, 002, 1 was advised by Gabe that a residential/(agriculture water study would be <br /> required prior to our application fbr the subject tentative map. On September 9, 2002 the <br /> tentative map application was submitted and on September 23, 2002 notice was received that on <br /> September 17, 2002 the application was deemed complete for processing and that the matter is <br /> set for D.C. on October 16, 2002 and P.C. November 17, 2002. <br /> On October 7, 2002 Gabe advised that the processing of the tentative, map would be delayed <br /> three to four months pending an updated traffic study. Under the circumstance we do not expect <br /> a delay. <br /> We anticipate that any significant traffic from the subject project is two years away at a minimum <br /> and therefore propose that the subject tentative map be subject to results of the traffic study for <br /> the entire master planned area. The master plan area traffic study was authorized, in writing,on <br /> October 9, 2002. <br /> Let me suggest that X11 conditions of a tentative map application i.e.: residential/ag water, traffic <br /> study, and etc, are included on the application form. <br /> S eerely, <br /> W. Dave Olmstead <br /> Post-W Fax Note 7671 Data o, ► <br /> Copy to: Gabe Karam To <br /> Copy to: Kerry Sullivan Yn4 From n <br /> Copy to: Roger Elissagaray Co./Dept. Co. <br /> Phone N Phone b <br /> Fax k !o _ �, �� Fax k <br />
The URL can be used to link to this page
Your browser does not support the video tag.