My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004853
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
7999
>
2600 - Land Use Program
>
PA-0200409
>
SU0004853
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:16:24 PM
Creation date
7/1/2022 4:36:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004853
PE
2611
FACILITY_NAME
PA-0200409
STREET_NUMBER
7999
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
APN
24808014, 16, &
ENTERED_DATE
2/22/2005 12:00:00 AM
SITE_LOCATION
7999 W LINNE RD
RECEIVED_DATE
2/25/2002 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan -5- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-02-409 <br /> b. The frontage improvements for Linne Road shall be constructed in conformance with the <br /> standards for one-half of an 84-foot right-of-way Minor Arterial. The developer may <br /> request a secured deferred Improvement Agreement. The construction of the frontage <br /> improvements will be deferred, upon execution of a Secured Deferred Frontage and <br /> Roadway Improvement Agreement with a deposit equivalent to their estimated <br /> construction costs prior to approval of the Parcel Map. (A $410.00 fee currently is <br /> required for processing per Development Title Table 9-240.2 in addition to a copy of the <br /> Grant Deed, legal descriptions and an estimate. The estimate and legal descriptions shall <br /> be prepared by a Registered Civil Engineer with a typical section drawing on a form to <br /> be supplied by the Department of Public Works and submitted to the Department of <br /> Public Works for approval. As an option, the Department of Public Works will prepare <br /> the drawing with estimate for an additional fee of$175.00.) (The fee due will be based <br /> on the current fee schedule.) <br /> (Development Title Section 9-1150.2(d)(3)) <br /> c. In the future cumulative traffic will require a traffic signal at Chrisman Road and Schulte <br /> Road intersection. The fair share percentage for Phase I is 1.3 %which shall require a <br /> payment of$10,400.00. <br /> d. In the future cumulative traffic will require a traffic signal at the Linne Road and <br /> MacArthur Road intersection. The fair share percentage for Phase I is 5.2 %which shall <br /> require a payment of$7,600.00. <br /> GK:BN:ar <br /> PACOMMENTS\SU\YR 2002\PA-02409(revision 2).wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.