My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014668
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
26255
>
2600 - Land Use Program
>
OX-91-4
>
SU0014668
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 4:12:37 PM
Creation date
7/7/2022 1:13:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014668
PE
2600
FACILITY_NAME
OX-91-4
STREET_NUMBER
26255
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
APN
02324001
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
26255 E BRANDT RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 . If the nature of the depcs� t <br /> ._r.,.._� and the mining method used permi- , <br /> describe and show the steps or phases of the mining operation that <br /> allow concurrent reclamation. Include a proposed time schedule <br /> for such concurrent activities . The top of the deposit will be gradually <br /> shaved and dried slimes will be replaced on a concurrent basis, w chi will�ake <br /> 1-5 year,,. The temporary and final slopes will not exceed 1.5:1. <br /> 21 . Describe the ultimate physical condition of the site and specify <br /> proposed use (s ) or potential uses , of the mined lands once <br /> reclaimed. The site will be leveled over to be used for cattle grazing and <br /> rnw props. - ---- <br /> 22 . For operations occurring within or adjacent to a seasonal or per- <br /> manent stream, river , or other body of water , describe actions <br /> being taken to protect water quality and wildlife habitat : <br /> All stream beds will be undistrubad and avoided to prevent problems with water <br /> duality and wildlife habitat. Dirt berms will be provi edfor ddditional---- <br /> _protection. <br /> 23 . Describe any actions being taken during the project and as part of <br /> the reclamation process that will enchange wildlife habitat . Also <br /> describe any trees or vegetation to be removed:_ <br /> No trees will be removed and native grasses will be reseeded to enhance the <br /> _Muality of wildlife habitat. <br /> 24 . Describe soil conditions and proposed soil salvage plan . <br /> All methods of erosion control will be utilized (Id. , retarding basins, <br /> settling ponds, ditches, and diking) . Native v etation will grow back. _ <br /> Dried slimes will be replaced evenly over excavation area. <br /> 25 . On an attached page, describe methods , sequence, andtiming for <br /> bringing reclamation of the land to its end state . Indicate on <br /> the site plan, or on diagrams as necessary . Include discussion of <br /> the following items : SED ATTACHED PAGE 6. <br /> A . Backfilling and grading <br /> B . Stabilization of slopes <br /> C . Stabilization of permanent waste dumps , tailings, etc . <br /> D . Rehabilitation of pre-mining drainage <br /> E . Removal, disposal or utilization of residual equipment, <br /> structures , refuse, etc . <br /> F. Control of contaminants, especially with regard to surface <br /> runoff and ground water <br /> G . Treatment of streambeds to control erosion and sedimentation <br /> H. Removal or minimization of residual hazards <br /> I . Resoiling and revegetation, with evidence that selected plants <br /> can survive the specific topography, soil , and climate of the <br /> site <br /> Reclamation Plan <br /> Quarry Excavation - 4 - ( 3/89 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.