Laserfiche WebLink
20 . If the nature of the depcs� t <br /> ._r.,.._� and the mining method used permi- , <br /> describe and show the steps or phases of the mining operation that <br /> allow concurrent reclamation. Include a proposed time schedule <br /> for such concurrent activities . The top of the deposit will be gradually <br /> shaved and dried slimes will be replaced on a concurrent basis, w chi will�ake <br /> 1-5 year,,. The temporary and final slopes will not exceed 1.5:1. <br /> 21 . Describe the ultimate physical condition of the site and specify <br /> proposed use (s ) or potential uses , of the mined lands once <br /> reclaimed. The site will be leveled over to be used for cattle grazing and <br /> rnw props. - ---- <br /> 22 . For operations occurring within or adjacent to a seasonal or per- <br /> manent stream, river , or other body of water , describe actions <br /> being taken to protect water quality and wildlife habitat : <br /> All stream beds will be undistrubad and avoided to prevent problems with water <br /> duality and wildlife habitat. Dirt berms will be provi edfor ddditional---- <br /> _protection. <br /> 23 . Describe any actions being taken during the project and as part of <br /> the reclamation process that will enchange wildlife habitat . Also <br /> describe any trees or vegetation to be removed:_ <br /> No trees will be removed and native grasses will be reseeded to enhance the <br /> _Muality of wildlife habitat. <br /> 24 . Describe soil conditions and proposed soil salvage plan . <br /> All methods of erosion control will be utilized (Id. , retarding basins, <br /> settling ponds, ditches, and diking) . Native v etation will grow back. _ <br /> Dried slimes will be replaced evenly over excavation area. <br /> 25 . On an attached page, describe methods , sequence, andtiming for <br /> bringing reclamation of the land to its end state . Indicate on <br /> the site plan, or on diagrams as necessary . Include discussion of <br /> the following items : SED ATTACHED PAGE 6. <br /> A . Backfilling and grading <br /> B . Stabilization of slopes <br /> C . Stabilization of permanent waste dumps , tailings, etc . <br /> D . Rehabilitation of pre-mining drainage <br /> E . Removal, disposal or utilization of residual equipment, <br /> structures , refuse, etc . <br /> F. Control of contaminants, especially with regard to surface <br /> runoff and ground water <br /> G . Treatment of streambeds to control erosion and sedimentation <br /> H. Removal or minimization of residual hazards <br /> I . Resoiling and revegetation, with evidence that selected plants <br /> can survive the specific topography, soil , and climate of the <br /> site <br /> Reclamation Plan <br /> Quarry Excavation - 4 - ( 3/89 ) <br />