Laserfiche WebLink
15 . Operation will be <br /> under 5 , 000 tons (cubic yards )/year <br /> 5 , 000-50 , 000 tons (cubic yards )/year <br /> 50 , 000-250 , 000 tons (cubic yards )/year X <br /> 250 , 000-1, 000 , 000 tons (cubic yards )/year <br /> over 1 , 000 ,000 tons (cubic yards )/year <br /> 16 . Total anticipated production <br /> Mineral • pmmodities to be removed 110,000 Xxs= (cubic yards ) <br /> Waste/ 4lTed on-site10,000 wnm (cubic—yards ) <br /> Waste disposed off-site_ N/A tons (cubic yards ) <br /> Maximum anticipated depth 25 feet <br /> 17 . Mining Method (check all applicable ) <br /> Open Pit X Gravel/Sand Pit Single Bench Drill and blast <br /> X Hilltop Sidehill <br /> Borrow Pit Underground <br /> Rail X Tailings Pond <br /> Truck to Processing Plant to Railroad <br /> Other (specify ) <br /> Multiple Bench Dragline <br /> Shovel Clay pit <br /> __Gravel Bar Skimming Slurry pump <br /> Waste Dump <br /> 18 . If processing of mined materials is to be conducted at , or <br /> adjacent to , the site, describe briefly the nature of the <br /> processing and explain disposal method of tailings or waste fro,-,I <br /> processing . Sand and gravel will be washed, screened to different sizes, and <br /> the caravel stockpiled. Sand will go over sluices to recover the p acer go , <br /> through a sandscrew for dewatering and then to stockpile. Tailings from the <br /> sand processing go to two tailings ponds and one slime pond. Water is recycled <br /> to a water holding pond for re-use. After drying, tailings will be graded back <br /> on to the excavation site. <br /> 19 . Estimate quantity (gallons per day ) and quality of water required <br /> by the proposed operation, specifying proposed sources of this <br /> water ; method of its conveyance to the site ; quantity and quality <br /> of used and/or surplus water ; and disposal of used and/or surplus <br /> water . 576,000 gallons of water per day will be used. All wastewater will <br /> settle or be recycled. Ground water will be purped to a surface storage pond <br /> and pumped through underground pipe to wash plant. W ste water will pimj�ed <br /> to tailings pond and then to holding pond and slime pond. Holding mond water <br /> will be pumped to main storage pond for eventual recycling. <br /> Reclamation Plan <br /> Quarry Excavation - 3 - ( 3/89 ) <br />