Laserfiche WebLink
8 . Attach a brief description of the extent of the mined lands to be <br /> involved in this operation . Include legal description and total <br /> acres . <br /> Section (s ) 28 Township 4N Range 9E <br /> 9 . Describe the access route to the operation site <br /> From Brandt Road one and one half miles of dirt road proceeds in a northeastern_ <br /> direction to operation site. <br /> DESCRIPTION <br /> 10 . Mineral commodity to be mined sand, gravel and placer gold <br /> 11 . Geologic Description - Briefly describe general geologic setting , <br /> with more detailed geologic description of mineral deposit to be <br /> mined, and principal soil or rock types present . <br /> The north part of the Questo Ranch is underlain by the Tertiary Laguna Formation. <br /> Consolidated gray sand and silt and clay form the lower part of the Formation <br /> The upper part of the Formation is oonglarerate, tannish-red in .color, <br /> composed in large part of rounded durable clasts set in a matrix of sand, silt and <br /> clay, and forms the mineral deposit from which sand, gravel, and placer gold. will <br /> be mined. <br /> 12 . Environmental Description - Briefly describe environment of site <br /> and surrounding area . Include existing area land use , soil , vege- <br /> tation, ground water elevation, surface water characteristics, <br /> average annual rainfall and other factors pertaining to environ- <br /> mental impacts and their mitigation and reclamation . ( Use addi- <br /> tional pages if necessary ) <br /> Range - with native grasses and Valley oak trees, cattle raising <br /> round water <br /> is located at a depth of 120 feet; two water ponds are present; the rainfall <br /> is about five inches a year; there is a distance of one and one half mile to <br /> the nearest residence. <br /> PROPOSED/EXISTING SURFACE MINING OPERATION <br /> 13 . Proposed starting date of operation September 1990 <br /> Estimated life of operation two years <br /> Duration of first phase two years <br /> 14 . Operation will be <br /> continuous seasonal X intermittent <br /> developed, not yet in operation <br /> temporarily deactivated stockpile in mine <br /> Reclamation Plan <br /> Quarry Excavation - 2 - ( 3/89 ) <br />