My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014693
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARCH
>
0
>
2600 - Land Use Program
>
S-79-2
>
SU0014693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 4:01:08 PM
Creation date
7/7/2022 1:52:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014693
PE
2600
FACILITY_NAME
S-79-2
STREET_NUMBER
0
STREET_NAME
ARCH
STREET_TYPE
RD
City
STOCKTON
APN
17921002
ENTERED_DATE
12/27/2021 12:00:00 AM
SITE_LOCATION
ARCH RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOORE & TABER NORTHERN CALIFORNIA <br /> CONSULTING ENGINEERS AND GEOLOGISTS <br /> GUIDE SPECIFICATION FOR PREPARATION OF FILL FOUNDATION <br /> and <br /> PLACEMENT OF CONTFOLLED FILL <br /> A. Site Preparation <br /> 1 . All trees, brush, logs and other debris shall be removed from <br /> the area to be filled. The area to receive fill shall be free <br /> of all roots and other organic material. Underground structures <br /> shall be removed, or may be crushed in place upon approval of <br /> the Soils Engineer. Unsuitable soil shall be removed from the <br /> fill foundation, exposing firm foundation material capable of <br /> achieving specified compaction. For fills to be placed on <br /> sloping surfaces, adequate fill foundation shall be exposed <br /> to the toe of fill slope extended to foundation level, unless <br /> otherwise specified or permitted by the Soils Engineer. <br /> 2. The exposed fill foundation shall be scarified to a depth of <br /> at least six (6) inches. Where fills are to be placed on <br /> hillslopes, scarifying shall be to depths adequate to provide <br /> bond between fill and fill foundation. Where considered <br /> necessary by the Soils Engineer, the ground surface shall be <br /> stepped or benched to achieve this bond. Vertical dimension <br /> of the required benches shall be as determined by the Soils <br /> Engineer, based upon location, degree and condition of hillslope. <br /> 3. The exposed and scarified fill foundation shall be watered as <br /> necessary and compacted to not less than 90% of maximum dry <br /> density achieved by ASTM D 1557 unless otherwise specified. <br /> B. Fill Material <br /> 1 . materials for the fill shall consist of material approved by <br /> the Soils Engineer. Such materials shall be free from vege- <br /> table matter and other deleterious substances and shall not <br /> contain rocks or lumps greater than 4-inches dimension. <br /> 12/15/70 Page 1 of 2 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.