My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014693
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARCH
>
0
>
2600 - Land Use Program
>
S-79-2
>
SU0014693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 4:01:08 PM
Creation date
7/7/2022 1:52:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014693
PE
2600
FACILITY_NAME
S-79-2
STREET_NUMBER
0
STREET_NAME
ARCH
STREET_TYPE
RD
City
STOCKTON
APN
17921002
ENTERED_DATE
12/27/2021 12:00:00 AM
SITE_LOCATION
ARCH RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOORE & TABER NORTHERN CALIFORNIA <br /> C O N S U L T i N O ENGINEERS A N D G EOL O O 1 5 T S <br /> GUIDE SPECIFICATION-CONTROLLED FILL <br /> C. Placement of Fill <br /> 1. Fill material shall be spread in uniform layers not exceed- <br /> ing 6-inches compacted thickness. Water shall be added to <br /> the fill or the fill allowed to dry as necessary to obtain <br /> fill moisture content at which compaction as specified can <br /> be achieved. <br /> 2. Each layer of fill shall be compacted to not less than 90% <br /> of maximum density achieved by ASTM D 1557 unless otherwise <br /> specified. Compaction shall be by sheepsfoot rollers, <br /> multiple-wheel pneumatic rollers or other acceptable rollers <br /> of such design that the fill can be compacted as specified. <br /> 3. If work has been interrupted by weather, scheduling or for <br /> any other reason, the Soils Engineer shall be notified by <br /> the superintendent of grading at least 24 hours prior to the <br /> intended resumption of grading. <br /> D. Supervision and Control <br /> 1. Field density tests shall be made of each layer of fill. <br /> Sufficient tests shall be made to assure that the required <br /> compaction has been achieved throughout the fill. When <br /> tests indicate that the specified compaction has not been <br /> achieved, that portion of the fill shall be re-worked until <br /> the required density has been attained. <br /> 2. Preparation of fill foundation and placement of fill shall be <br /> supervised by the Soils Engineer so that he can render a pro- <br /> fessional opinion on the conformance of the completed fill to <br /> the specifications. <br /> 12/15/70 Page 2 of 2 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.