Laserfiche WebLink
Complaint Investigation Summary Report #. 5105 <br />COMPLAINT ID: C00053523 <br /> <br />Site Location: 9927 LOWER SACRAMENTO RD <br /> <br />04/07/2021 <br />04/08/2021 <br />04/14/2021 <br />04/20/2021 <br />04/20/2021 <br />Activity Summary <br />Completing ERT evaluation report <br />Lincolon Fire district, Stockton Fire Service. Called 937-8801 and spoke with fire. <br />The clerk who answered could not give out specific information (she would not <br />know the information). She said that I needed to complete a request form, which <br />sounded like a public records release application. I again let her know that this <br />request was from SJC ERT. I asked if I could speak with the chief. <br />Completed form and sent back. <br />Emailed evaluation to Zoey for signature. Received signed evaluation back from <br />Zoey. She said to send to Matt Paulin or someone at CAO tasked with reviewing <br />and signing ERT evaluation. I discussed with Steven S and got Muni N's signature <br />for EHD. <br />I called CAO and was directed to Matt Paulin's voice mail. I left a message <br />explaining my call and asked for a call back. <br />Site visit for the posting of the encampment. Eric Annbriz of Public Works was also <br />on site. Posted the 72 hr Notice as well as pamphlets regarding assistance. <br />No unsheltered individuals on site. There is not much garbage outside of the <br />tunnel. Unknown amount in the tunnel. <br />Downloaded photos from camera. Created the photo log <br />ERT "clean up" day. Public Works on site (Channel and Road). A remote <br />controlled camera was put into the tunnel. The tunnel goes 10 ft East from the <br />opening and 9 ft South from opening. These are 2 separate "hallways" inside the <br />tunnel. There was a toolbox, mattress, bicycle rims, milk crate. <br />Road Maintenance said they would probably fill tunnel with cement if they were the <br />ones to do the job. Channel Maintenance would probably use grout if they were to <br />fill it. <br />Spoke with Eric Ambriz. They still have to discuss how to fill in the tunnel. He will <br />talk with Troy Botts later. They may need a contractor with confined space training <br />to go inside. Eric will update me and let me know after they talk about it. <br />Site visit to watch the grouting of the tunnel. Spoke with Mitch (Road Maintenance) <br />and he said that cement trucks may not arrive until 10:30am. RSP rocks have <br />already been put down. Took pictures. Will come back later when the cement <br />trucks are on site. <br />Site visit again to see cement pumped. I missed the first cement truck being <br />pumped into tunnel. I saw the second truck being pumped and saw the third truck <br />arrive on site. <br />Activity Date <br />04/05/2021 <br />04/06/2021 <br />04/08/2021 <br />04/13/2021 <br />Recorded by <br />SANGALANG <br />SANGALANG <br />SANGALANG <br />SANGALANG <br />SANGALANG <br />SANGALANG <br />SANGALANG <br />SANGALANG <br />SANGALANG <br />04/20/2021 Photo logs for both of today's visits made. SANGALANG <br />07/15/2021 ERT debrief form completed <br /> <br />SANGALANG <br />06/29/2022 Abated the complaint and turned it in for review. SUSZYCKI <br />5105 rpt <br />Page 2 of 2