Laserfiche WebLink
Emergency Shut-Off (ESO) Testing 21204145 . 5 <br /> Facility#:Arco 7092 Contractor.Gettler-Ryan Inc. <br /> Address:2510 S. Hwy 99 Address:6805 Sierra Ct. Suite G <br /> City, State:Stockton, CA City, State:Dublin, CA 94568 <br /> Test Date:8/22/2022 Technician:Robert Jacobs <br /> The objective of this test is to provide assurance that when the ESO switch is activated, all the fueling system circuits <br /> (turbines, and dispensers)are de-energized, and remain de-energized until they are re-set manually. <br /> SWITCH# 1 2 3 4 5 <br /> Location of ESO Building Cashier Electrical <br /> (be specific) Panel <br /> Type of Switch: Momentary Momentary Momentary <br /> Push Pull Momentary <br /> Plain light/Toggle Other <br /> Type of Turbine Control Relay System: Carolina Box <br /> Power Integrity Custom Fab. Square D <br /> Power Solution Carolina Box Brown Box <br /> PERFORMANCE TEST <br /> Does the ESO shutdown power to the Y <br /> DISPENSERS? (YIN) Y Y <br /> Does the ESO shutdown power to the Y <br /> TURBINES? (Y/N) Y Y <br /> Pass <br /> OVERALL RESULT(Pass or Fail) Pass Pass <br /> If the test fails and cannot be fixed while onsite, call the Help Desk&document the ticket number <br /> If the test fails,contractor MUST: place an"Out of Service"tag on the ESO(s), &notify the site manager and teach them <br /> alternative emergency shut down procedures (i.e., locate circuit panel, clearly identify turbine and dispenser breakers for shut- <br /> off in the event of an emergency) <br />