Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> fi. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 DSL <br /> Are both vent and tank riser pipingYes f Yes YYes Yes <br /> ENo <br /> secondarily contained? No No No <br /> OPE Model OPW 71SO OPW 7150 OPW 7150 <br /> What is the OPE response when activated? 21 Shut off fShut off A Shut off Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> estricts estricts L�estricts bRestricts <br /> Flow Flow Flow Flow <br /> Audible Audible Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes` Yes` Yes* <br /> that may interfere with the OPE operation? f No 7,( No Hv, No No <br /> At what level in the tank is the OPE set to <br /> activate? Inches from bottom of tank) 102 3/4" 102 3/8" 103 1/8" <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 91.egg sa.1e� 51.66 <br /> Is the OPE in proper operating condition to _,6 Yes f Yes /J Yes Yes <br /> respond when the stored substance No No No No <br /> reaches the designated regulatory level? P P <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results f Passf Pass f Pass Pass <br /> Fail Fail Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> * Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements. calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />