My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:21 PM
Creation date
8/19/2022 11:58:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO 07092
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
01
SITE_LOCATION
2510 S HWY 99 RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�=jaf��pr 10 z 31� <br /> Appendix B <br /> 7150 Overfill Valve in rank Shut off Level Worksheet <br /> fmportant: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> Distance from the 7150 inlet tube flange to the cast <br /> lug in the 7150 body(see figures),upper tube length. <br /> Note: the Lipper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> Distance from the 71 SO inlet tube flange to the top and , <br /> (W)= Ib5 'Iz 1� <br /> (D} ' <br /> (1J)_ !' to # 7��r 1 ! Upper <br /> Tube <br /> D'stance from the 71 SO inlet tube flange to the bottom I __j <br /> of the tank. Note:If a tank bottom protector is present it I <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 &61,IP,models add 0.6") (W;Valve <br /> (B)_ �(r �y +r Length. <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut , <br /> facturer find the dipstick number(Y)which corresponds <br /> to the 1005/o volurn (B) �{I <br /> To Tank <br /> { \; l <br /> 1. To determine shut-off percentage: i (Y,Tank <br /> Subtract upper tube length (D) from distance to tank (U)Valve Chart <br /> bottom (B) <br /> � ! Length, 100% <br /> (X)_(B)—(D) -Z" D D 3/ top of cut I Volume II <br /> D pstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated(X)dimension and the 100%volume(Y}tank ! <br /> capacity. j I li <br /> • I <br /> (X)tank capacity in gallons= d 1 3 ! 4 <br /> F ;f <br /> (Y)tank capacity in gallons= <br /> SO%=(X)capacity/(Y)capacity x100 <br /> Dote: The overfill valve must be installed per AHJ require- <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overf 11 <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.