My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
2510
>
2300 - Underground Storage Tank Program
>
PR0547192
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:21 PM
Creation date
8/19/2022 11:58:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0547192
PE
2351
FACILITY_ID
FA0026782
FACILITY_NAME
ARCO 07092
STREET_NUMBER
2510
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17130024
CURRENT_STATUS
01
SITE_LOCATION
2510 S HWY 99 RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fla pp (_ 1 D31'� �a1G <br /> Appendix 8 <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to folloOng the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> Distance from the 7150 inlet tube flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the Upper Tube Length must be at%east 16" to in- <br /> clude the protective bend in the tube. <br /> (o) _ Z <br /> Distance from the 71$0 iniet tube flange to the top a-,d <br /> IJ fl:::SSI VI IVVYCI L _ZYCIvC "moi <br /> = <br /> 3 <br /> (W) r r u7 ' <br /> upper <br /> Tube <br /> D stance from the 71 SO inlet tube Flange to the bottom <br /> of the tank. Note:if a tank bottom protector is present it i <br /> may be-necessary to add this thickness to dimension 1 .. <br /> ;OPW 6111 &61TP odels add 0.6") c; <br /> ! 7 y j (lN}Valve <br /> (B)_ Length, <br /> i <br /> bottom of <br /> ;t <br /> From the tank calibration chart provided by tank mann- cut <br /> facturer find the dipstick number',Y)wh:_-h corresponds <br /> tothe 100%volij1fn�i (B) <br /> (Y)= 3 To Tank <br /> 1 4 I h# <br /> 1. To determine shut-off percentage: I Tank <br /> r <br /> Subtract upper tube length (Di from distance to tark lu)Valve _ Chart <br /> bottom(B) •�' 1 1 `Length, j 1009", yl <br /> (X) —(S)—(D)-Z"; 1 top of cut I Volume <br /> Dipstick 5 <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated(X)dimension and the 100%volume(Y}tank <br /> capacity. 3 4 <br /> (X)tank capacity in gallons= 93 <br /> (Y)tank capacity in gallons= p 19 _- <br /> 50%=(X)capacity 1(Y)capacity x100 JP" <br /> Note: The overfill valve must be installed per AHJ require- <br /> ments and all applicable IOcal,state,and national codes. if <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40(FR part 280 Subpart B Section 280 20 oter'Ml <br /> valves should be set to a maximum of 95% <br /> �'I <br />
The URL can be used to link to this page
Your browser does not support the video tag.