Laserfiche WebLink
1.5 The lead cultivation technician will begin to water one cultivation tray/table at a time,while another <br /> cultivation technician observes the Primary Wastewater Receptacle that is located underneath the drainage <br /> grate of the cultivation tray/table that is being watered <br /> 1.6 The cultivation technician who is operating the Mobile Wastewater Receptacle,observes the Primary <br /> Wastewater Receptacle that is collecting the wastewater from the cultivation tray/table being watered by <br /> the lead cultivation technician <br /> 1.7 As the Primary Wastewater Receptacle begins to fill,the cultivation technician who is operating the Mobile <br /> Wastewater Receptacle places the pump that is connected to the Mobile Wastewater receptacle inside of it, <br /> and begins to pump the wastewater into the Mobile Wastewater Receptacle <br /> f - - <br /> R <br /> F <br /> 1.8 Once all wastewater has been drained from the tray/table that the lead cultivation technician has just <br /> watered,repeat steps 4.3 through 4.5,until all cultivation trays/tables within the cultivation unit have been <br /> adequately watered <br /> 1.9 After the watering process is complete,and all wastewater has been collected into the Mobile Wastewater <br /> Receptacle,transport the Mobile Wastewater Receptacle to the onsite Stationary Wastewater Receptacle <br /> 1.10 Place the pump connected to the Mobile Wastewater Receptacle into the Stationary Wastewater Receptacle <br /> 1.11 Pump all wastewater from Mobile Wastewater Receptacle into the Stationary Wastewater Receptacle <br /> HE DEVELOPMENT CORP 14 <br />