My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015158
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
1400
>
2600 - Land Use Program
>
PA-2200186
>
SU0015158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 8:49:16 AM
Creation date
9/16/2022 1:46:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015158
PE
2637
FACILITY_NAME
PA-2200186
STREET_NUMBER
1400
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
City
LATHROP
Zip
95330-
APN
19127021
ENTERED_DATE
9/14/2022 12:00:00 AM
SITE_LOCATION
1400 W FREWERT RD
RECEIVED_DATE
9/13/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.5 The lead cultivation technician will begin to water one cultivation tray/table at a time,while another <br /> cultivation technician observes the Primary Wastewater Receptacle that is located underneath the drainage <br /> grate of the cultivation tray/table that is being watered <br /> 1.6 The cultivation technician who is operating the Mobile Wastewater Receptacle,observes the Primary <br /> Wastewater Receptacle that is collecting the wastewater from the cultivation tray/table being watered by <br /> the lead cultivation technician <br /> 1.7 As the Primary Wastewater Receptacle begins to fill,the cultivation technician who is operating the Mobile <br /> Wastewater Receptacle places the pump that is connected to the Mobile Wastewater receptacle inside of it, <br /> and begins to pump the wastewater into the Mobile Wastewater Receptacle <br /> f - - <br /> R <br /> F <br /> 1.8 Once all wastewater has been drained from the tray/table that the lead cultivation technician has just <br /> watered,repeat steps 4.3 through 4.5,until all cultivation trays/tables within the cultivation unit have been <br /> adequately watered <br /> 1.9 After the watering process is complete,and all wastewater has been collected into the Mobile Wastewater <br /> Receptacle,transport the Mobile Wastewater Receptacle to the onsite Stationary Wastewater Receptacle <br /> 1.10 Place the pump connected to the Mobile Wastewater Receptacle into the Stationary Wastewater Receptacle <br /> 1.11 Pump all wastewater from Mobile Wastewater Receptacle into the Stationary Wastewater Receptacle <br /> HE DEVELOPMENT CORP 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.