Laserfiche WebLink
TABLE OF CONTENTS (continued) <br />2.3.4.1 Quantity and Quality of Wastewater from Project..........................................17 <br />2.3.4.2 Denitrification Estimate.................................................................................17 <br />2.3.5 Nitrate Loading Scenario........................................................................17 <br />2.3.6 Impact of Nitrate Loading to Nearby Water Sources...............................18 <br />2.4 Discussion of Nitrate Loading Results................................................................18 <br />2.4.1 Total Nitrate Impact................................................................................18 <br />2.4.2 Methods of Mitigation.............................................................................18 <br />3.0 CONCLUSIONS AND RECOMMENDATIONS..............................................................18 <br />4.0 LIMITATIONS................................................................................................................19 <br />5.0 SELECTED REFERENCES..........................................................................................20 <br />APPENDIX A: VICINITY MAP AND SITE MAP <br />APPENDIX B: HISTORICAL INFORMATION <br />APPENDIX C: SEPTIC PERMITS <br />APPENDIX D: GROUNDWATER, SOIL AND GEOLOGIC INFORMATION <br />APPENDIX E: ONSITE WASTEWATER SYSTEM PERMIT, PERCOLATION TEST FORM <br />APPENDIX F: NITRATE LOADING CALCULATION, WATER BALANCE RECHARGE <br />APPENDIX G: GROUNDWATER ANALYTICAL REPORT <br />Responsive ■ Resourceful ■ Reliable <br />