Laserfiche WebLink
PROJECT: Ahern Road Fueling Station February 28, 2022 <br /> Job No: 20-544 Ross P.Shoaf,Civil Engineer <br /> SCHEMATIC LEACHFIELD LAYOUT— No Scale <br /> a <br /> One of 6 Fields Fed by Indexing Valve <br /> X <br /> Flushing Assembly at End of Each Line Control Valve at Each Line a <br /> c <br /> 0 <br /> 1� <br /> 72' <br /> AU 6 Fietds Will Have 5 Trenches for a Total of 30 trenches @ 72' = 2,160' total <br /> See Exhibit Sheets for Trench and <br /> Lateral Detail <br /> DETAILED DESIGN FOR LEACHFIELD LATERALS <br /> Manifold (Header ) Pipe Size: 2" <br /> Lateral Pipe Size: 1 %" Total Number of Laterals: 30 <br /> Orifice Size: 1/r Orifice Spacing: 48" Number of Orifices per lateral: 18 <br /> Total Number of Orifices 30 laterals X 18 Orifices = 540 <br /> Carson Boxes <br /> two oer Lateral. <br /> Orifice Shield Over FlUsi'ling <br /> _ /s' Orifice 4' S acin Valve <br /> Adjustrlent , <br /> Valve <br /> ❑ver all Trench Length 72' <br /> Schematic lateral layout <br /> No Scale <br /> Page 9 Of 11 <br />