Laserfiche WebLink
PROJECT: Ahern Road Fueling Station February 28, 2022 <br /> Job No: 20-544 Ross P. Shoat Civil Engineer <br /> 6. Equipment needed for the Secondary treatment Assembly: <br /> a.) 2-AX100 pods <br /> b.) 1—3 Float Assembly(to match TCOM panel) <br /> c.) 2-pumps to dose Pods(PF5007) <br /> d.) 1-2 pump Flow Inducer Tower(FIT) <br /> e.) 1-Splitter Valve to Dosing/Discharge tank(RBV)set at 80%of tank volume <br /> f.) 1-Liquid Chemical Feeder for Carbon (LCF 3060-13G) <br /> g.) 1-Vent Fan (AXVFAFC—Green) <br /> h.) 1-Secondary Vent(AX-Vent Kit) <br /> 7. Discharge Equipment <br /> a.) 2-Discharge Pumps(PF5007) <br /> b.) 1-2 pump Flow Inducer Tower(FIT) <br /> c.) 1—4 Float Assembly(for TCOM panel) <br /> d.) 1-Flow Meter(FM 200) <br /> e.) 1-Distributing Valve V6606A <br /> f.) 1-Distributing valve enclosure RR24XX <br /> Page 8 Of 11 <br />