Laserfiche WebLink
22 <br /> Paul W. Donoho, R.E.H.S. #6227 <br /> (530) 701-9972 <br /> AdvanTexe O&M <br /> COMMERCIAL TREATMENT SYSTEMS <br /> Maintenance • • <br /> Preventive Maintenance Monthly Maintenance <br /> As with any engineered system,such as a car or heat pump,your Once a monfh,during the first year of operation,make a visual inspection <br /> wastewater treatment system will work better and last longer if it is of the liquid levels in the septic,recirculation/blend,and dosing tanks.The <br /> regularly maintained by a qualified service provider.The service provider liquid level should never be lower than the"Redundant Off"float.If liquid <br /> should be present during installation,so he or she is familiar with the leaks out of the tank,the scum layer can drop to the level of the perimeter <br /> system,especially those service lines,conduits,and connections that get holes in the pump vaults and cause the screen to plug.A watertight tank is <br /> buried. important and any leakage must be corrected. <br /> Your system will work better and last longer if you Team what not to During the first year of operabon,check the Biotuhe®filter in the septic tank <br /> put into the treatment system.There should be no disposal of toxics or every month and clean when necessary.Fallow the applicable instructions <br /> chemicals into the system,such as restaurant degreasers,cleansers,wax found in Appendix B for cleaning Biotube filters. <br /> strippers for linoleum,carpet shampoo and its waste products,and other Once a me*.during the first year of operation,the Biotube Pump <br /> toxics.As a general rule,nothing should go into any wastewater treatment <br /> system that hasn't been ingested,other than toilet tissue,mild detergents, <br /> and wash water.Every system user and qualified service provider should <br /> Tom-9qe RmrANnY hau Rlur <br /> be familiar with the basic guidelines below: <br /> • No septic additives <br /> • No flammable or toxic products o <br /> • No excessive use of household cleaners or chlorine bleach - - <br /> • No pool or spa products — - <br /> • No disposing of pharmaceuticals Spmlayer <br /> • No pesticides,herbicides,or agricultural chemicals or fertilizers c,�r:oRa <br /> • No RV waste(unless the system is specifically designed and <br /> enolneered to treat such waste) <br /> eAo,oe c,.rm <br /> • No surface runoff and storm water _ <br /> • No excessive amounts of fats,oils and grease(FOG) <br /> • No food byproducts Vaults should he examined to determine if cleaning of the Btotube filter is <br /> • No cigarette butts <br /> • No paper towels,news necessary.It the liquid level inside the vault is discernibly different from the <br /> p p papers,sanitary napkins,diapers,disposable level outside the pump vauit while the pump is running,dean ng is required. <br /> wipes,floss,gum or cantly wrappers,etc. Remove the filter cartridge and clean it following the applicable instructions <br /> • No chlorides or water softener backwash in Appendix B. <br /> Preventive maintenance should start with facility user and/or homeowner Once a month,read the hour meters and event counters for the <br /> education.Orenco Systems",Inc.can provide a manual of Do's and recirculating/blend and dosing tank's pumps.Each pump should run <br /> Don'ts to distribute upon request.To request multiple copies of this approximately the same number of hours and tum on approxinn iy the <br /> manual,contact Orenco Systems,Inc.at 1-800-348-9843. same number of times as their operating counterpart.If the run times or <br /> With preventive maintenance and periodic inspections,the wastewater cycle times differ significantly between pumps,determine the cause of the <br /> treatment system will function for decades. discrepancy and take corrective measures, <br /> lt there is a distributing valve,manually cycle the valve through every outlet <br /> Scheduled Maintenance to confirm proper operation. <br /> Scheduled maintenance should be performed in the time frames described <br /> In this section.A chart showing scheduled maintenance activities and times <br /> is included at the end of this section,for your convenience. <br /> AIM-OM-ATX-3,Rev.2.1,05115 •.Copyright erenco Systems®,Inc�Property of Oreaco Systems•,inc.no nb[repm6uce or tllsfibut.without written authorization tram 0r.Reo.BRU-348-.. . <br />