Laserfiche WebLink
PROJECT : Ahern Road Fueling Station February 28, 2022 <br /> Job No : 20=544 Ross P. Shoat Civil Engineer <br /> Installation Specifications for Filters, tanks and Floats <br /> All equipment elevations must be calculated from the invert of the outlet of the septic tank . See attached <br /> elevation sheet for details . No tank shall be buried deeper than recommended by the manufacturer. Spacing shall <br /> also be as recommended by the manufacturer or as plumbing allows . <br /> Float settings are shown on Exhibit #6 . All Floats are coupled to the timers in the TCOM panel . Timers to be reset <br /> by service provider after initial operation break-in . <br /> The installation and setup of all Orenco® equipment is to be overseen by the supplier of the equipment . <br /> Page 11 Of 11 <br />