My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085076_OWTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AHERN
>
29700
>
4200 – Liquid Waste Program
>
SR0085076_OWTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 4:13:58 PM
Creation date
9/29/2022 9:09:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
OWTS
RECORD_ID
SR0085076
PE
4201
FACILITY_NAME
AHERN TRUCK STOP
STREET_NUMBER
29700
Direction
S
STREET_NAME
AHERN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25502014
ENTERED_DATE
3/29/2022 12:00:00 AM
SITE_LOCATION
29700 S AHERN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT : Ahern Road Fueling Station February 28 , 2022 <br /> Job No : 20-544 Ross P . Shoat Civil Engineer <br /> i <br /> I <br /> z <br /> ] 2' <br /> MW1 M�4 ' :P �;CP4 <br /> TRENCH CROSS SECTION ( NOT TO SCALE ) <br /> See Exhibit Sheets for Further Details <br /> Installation Specifications For Trenches <br /> Trenches must be installed with trench bottoms level within 2 inches deviation over the length of the trench . <br /> Install lateral pipe level, with orifices facing up . Drill orifices with a sharp new bit and clear out any shavings left <br /> behind . ( pre-drilled pipe may be used ) Prior to testing assure drain rock is cleared away from each orifice, leave <br /> orifice shields off for a run-out test to adjust squirt height along each lateral ( adjusted for hydraulic variance from <br /> lateral to lateral ), schedule Engineer and County inspector (as required ) for testing and certification . <br /> After testing has been approved, install all orifice shields, complete drain rock installation, cover with filter fabric <br /> and install final soil cover and seed . Request a final inspection from the county inspector. Cover soil shall be <br /> native loam material 12" over the trench drain rock and shall be slightly mounded over each trench to <br /> accommodate settlement . Disturbed area shall be protected by placement of straw mulch and appropriate <br /> seeding for the area . <br /> Page 10 Of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.