My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085076_OWTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AHERN
>
29700
>
4200 – Liquid Waste Program
>
SR0085076_OWTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 4:13:58 PM
Creation date
9/29/2022 9:09:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
OWTS
RECORD_ID
SR0085076
PE
4201
FACILITY_NAME
AHERN TRUCK STOP
STREET_NUMBER
29700
Direction
S
STREET_NAME
AHERN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25502014
ENTERED_DATE
3/29/2022 12:00:00 AM
SITE_LOCATION
29700 S AHERN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GrenCOr <br /> Design , <br /> Design Specifics <br /> Tankage Requirements <br /> Primary tankage for apartment complexes is usually provided as either a single primary tank or through the use of several distributed primary <br /> tanks(locating smaller tanks next to each apartment block). If distributed primary tanks are used, pumps may be required if the treatment facility <br /> is located at an elevation higher than the primary tanks. <br /> Apartment complexes fall within Application Type 1 in Appendix A; therefore total primary tank recommendations call for a minimum of 2 days' <br /> retention at maximum day design flow.Since a pre-anoxic tank is required and will be situated at the treatment site, provide a minimum of 1 day <br /> retention in primary and 1 day retention in pre-anoxic. <br /> Table 1A-3:Sample Tank Sizing Recommendations <br /> Tank Sizing Max.Day Design Flow(gpd) Recommended Minimum Primary Tank Size(Gallons) <br /> Primary Tank 10,800 10,800—use 12,000 <br /> Pre-Anoxic Tank 10,800 10,800—use 12,000 <br /> A two-stage AdvanTex is required for ammonia removal.The configuration is as follows (see page 11): <br /> Alkalinity Feed <br /> Pre-Anoxic Return Line <br /> Primary Pre-Anoxic 1st Stage 2nd Stage Discharge <br /> Treatment AdvanTex AdvanTex <br /> Figure 1A-1.Configuration for Ammonia Removal <br /> Loading Calculations—First Stage <br /> For all first stage calculations,the design maximum day loading rates are double the average day design loading rates.Since the design maximum <br /> day flow is not greater than two times the average day design flow,the calculation for maximum day design load is unnecessary. <br /> Organic Loading <br /> Since BODS is greater than TSS,the calculation for the most restrictive parameter(BODS) is necessary. Design Average OLRA is 0.04 lbs <br /> BOD5/ft2•d. (See Standard AdvanTex Stage Sizing, Design Criteria page 15).Use Equation 1311 from Appendix B to determine the pounds per <br /> OLA = (140 mg/L) * (8.34 x 10-6 lbs•L/mg•gal) * (5,400 gpd) = 6.31 lbs/d <br /> day of Average Day Organic Load, OLA: <br /> (6.31 lbs/d) z <br /> AoLxA = 0.041bs/ftzd — 158 f t <br /> Determine the textile area required based on Average Day Organic Load,AOLRA using Equation 1.1: <br /> Hydraulic Loading <br /> Design average HLRA is 25 gpd/ft2.((See Standard AdvanTex Stage Sizing,Design Criteria page 15). Use Equation 1.2 to determine the textile <br /> area required based on Average Day Hydraulic Load: <br /> (5400 gpd) f z <br /> A"`RA — 216t— 25 gal <br /> NDA-ATX-1 Orenco Systems®•800-348-9843•+1 541-459-4449•www.orenco.com <br /> Rev.8,©10/20 <br /> Page 28 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.