My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085076_OWTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AHERN
>
29700
>
4200 – Liquid Waste Program
>
SR0085076_OWTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 4:13:58 PM
Creation date
9/29/2022 9:09:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
OWTS
RECORD_ID
SR0085076
PE
4201
FACILITY_NAME
AHERN TRUCK STOP
STREET_NUMBER
29700
Direction
S
STREET_NAME
AHERN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25502014
ENTERED_DATE
3/29/2022 12:00:00 AM
SITE_LOCATION
29700 S AHERN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design <br /> Total Nitrogen Loading <br /> Design average TNLRA is 0.014 lbs TKN/ft2(from page 15). Use Equation 131 from Appendix B to determine the pounds per day of Average <br /> Day Nitrogen Load,TNLA : <br /> Determine the textile area required based on Average Day Nitrogen Load,'TNLRA using Equation 1.3: <br /> TNLA,lbs/d= (50 mg/L) * (8.34 x 10-6 lbs•L/mg•gal)* (5,400 gpd) = 2.251bs/d <br /> Ammonia Loading <br /> (2.251bs/d) f 2 <br /> ATNLRA 0.0141bS/ft2d = 161 t <br /> Design average ALBA is 0.01 lbs NH3-N/ft2. Use Equation 131 from Appendix B to determine the pounds per day of Average Day Ammonia <br /> Load,ALA: <br /> ALA,lbs/d= (40 mg/L) * (8.34 x 10-6 lbs•L/mg•gal) * (5,400 gpd) = 1.8 lbs/d <br /> Determine the textile area required based on Average Day Ammonia Load,AALRA using Equation 1.4: <br /> (1.81bs/d) f z <br /> AALRA 0.01 lbs/f t2 d — 180 t <br /> The treatment area associated with the Hydraulic Loading Rate is the most restrictive; therefore,the first stage AdvanTex area should be a <br /> minimum of 216 ft2. <br /> Treatment Unit Options— First Stage <br /> Option 1: Using AX-Max units—216 ft2 area <br /> AX-MAX225-35 (Max unit includes recirc-blend tankage and discharge tankage) <br /> Option 2:Using AX pod units —216 ft2 area <br /> (3)AX100, 8100-gallon recirc tank(recirculation-blend tank sized at minimum of 75%of QM per page 17 of Design Criteria) <br /> Loading Calculations—Second Stage <br /> For all second stage calculations,the values used are based on the predicted performance of the first stage system. Per page 25 of the design <br /> criteria,the Standard AdvanTex Stage treated effluent values for BODS and TKN are typically based upon 90% BODS removal, 95% nitrification, <br /> and 70% denitrification through Pre-Anoxic Stage and First-Stage AdvanTex Treatment. <br /> Organic Loading <br /> Design Average OLRA is 0.02 lbs BOD5/ft2•d (from page 15).Use Equation B5 in Appendix B to determine the value of First-Stage AdvanTex <br /> effluent BOD5e: <br /> BOD$, = 140 mg/L x(1 — 0.9) = 14 mg/L <br /> Determine the pounds per day of Average Day Organic Load, OLA using Equation B1 from Appendix B: <br /> OLA2 = (14 mg/L) * (8.34 x 10-6) * (5,400 gpd) = 0.32 lbs/d <br /> Determine the textile area required based on Average Day Organic Load,AOLRA using Equation 1.1: <br /> (0.32 lbs/d) z <br /> AOLRA 0.021bS/ft2d — 16 ft <br /> Orenco Systems®•800-348-9843•+1541-459-4449•www.orenco.com NDA-ATX-1 <br /> Rev.8,©10/20 <br /> Page 29 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.