Laserfiche WebLink
PROJECT: Ahern Road Fueling Station February 28, 2022 <br /> Job No: 20-544 Ross P. Shoaf, Civil Engineer <br /> EQUIPMENT LIST <br /> This list is not comprehensive,and it is up to the supplier and contractor to double check and verify this list and all extras <br /> such as pipes fittings and backfill materials. <br /> 1. The Septic Tank dimensions on the plan are based on a Darco 20,000 Gallon two Compartment Fiberglass <br /> tank. (Any substitution must be of the same or nearly the same physical dimensions to meet all setback <br /> requirements and elevations per the plan.) <br /> 2. All other tanks are as follows and should be sourced from appropriate suppliers.They are to be guaranteed <br /> watertight. <br /> a. 1-1,000 gallon Grease Interceptor tank <br /> b. 1-8.000 gallon Single Compartment Pre-Anoxic tank <br /> c. 1-5,000 gallon Single Compartment Primary Recirculation Tank <br /> d. 1-4,000 gallon Single Compartment Post Anoxic Tank <br /> e. 1-2,500 gallon Single Compartment Secondary Recirculation Tank <br /> f. 1-5,000 gallon Single Compartment Final Discharge/Dosing Tank <br /> The following equipment is manufactured BY Orenco®Systems, Phone:800-348-9843, FAX:541-459-2884 <br /> NOTE:At time of ordering,it is important to request that all catalog numbers be double checked for errors, <br /> correctness and compatibility to design. Supplier should also double check design for all equipment needed. <br /> 3. Control Equipment <br /> 1-Control Panel(TCOM) CUSTOM Control Panel(Voltage to match customer specs) <br /> 4. Equipment for the Leach Field Lines. <br /> a. 2,160'-of Filter Fabric (LIFF27) Use at leach lines <br /> b. 540-Orifice Shields (OS125) Use at leach lines, 1.25"size <br /> c. 60-Ball Valves, 1.25"size(VLT1250S) Use at each Leach Line for flow adjust and flushing <br /> d. 30-Flushing Assemblies(SEA125C) At end of each Leach Line <br /> e. 60-Valve Boxes(VB7) At each end of Leach lines(ball valves and Flushing) <br /> 5. Equipment needed for the Primary treatment Assembly: <br /> a.) 5-AX100 pods <br /> b.) 4-pumps for dosing AX100 Pods(PF7510) <br /> c.) 1—3 Float Assembly(to match TCOM panel) <br /> d.) 1-pump for feedback to Pre-Anoxic Tank(PF300512) <br /> e.) 1-RO float assembly for Anoxic return pump <br /> f.) 1—5 pump flow inducer tower(FIT) <br /> g.) 5-2" Discharge Assemblies(HV200-BXQPR) <br /> h.) 1-Splitter valve to post-Anoxic tank(RBV)set at 80%of tank volume <br /> L) 1-Liquid Chemical Feeder for Alkalinity(LCF 3060-13G) <br /> j.) 1-Vent Fan(AXVFACF—Green) <br /> k.) 1-Secondary vent(AX-Vent Kit) <br /> Page 7 Of 11 <br />